AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 5 07:21:00 2025
Author
*
:
Subject
*
:
<p>CARME setup checked by vaccum group this morning. </p> <p>Both IE514 gauges de-gassed. To de-gas on the CM52 controller select the channel and hold the right arrow for two seconds. The reading will flash indicating the de-gassing procedure, this lasts for 2 minutes before completing. Flashing automatically stops once procedure finishes. Attached for convinience is the wire colour-pin assignment for the gauge head again.</p> <p>Baking jacket fully assembled around CARME and baking code updated. Temperature and rate limits updated to match thermocouples around the chamber.</p> <p> Max Temperature Max Rate</p> <p>Chamber 155C 10C</p> <p>Floating 175C 150C</p> <p>Octagon (outside tent) 50C 10C </p> <p> Automatic baking started at 13:50, pressure was 1.69e-7 mbar</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown