AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Sep 12 08:38:52 2020
Author
*
:
Subject
*
:
Saturday 12 Sep 08:43 Remotely checked status of baking. See attached. Baking appears to be proceeding OK. No thermocouples disconnected. Speed is slower than previously observed, limited by thermal gradients observed across both octagon and CARME vessel as a result of new thermocouple placement. Octagon gradient may not be real, and could be a result of placement of Octagon side thermocouple? Main concern is temperature recorded by CJC in Picolog2 (aka Room temperature 2) at 31 C, increasing. The second picolog may be too close to the tent. If the temperature keeps increasing it may stop working. Will keep monitoring.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20200912_0839_ctrl.png
Original size: 882x1018
Attachment 2:
20200912_0839_plot.png
Original size: 1917x1003
Attachment 3:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown