Tue Nov 9 15:03:29 2021, RSS + OG, Burnt cables issues 7x
|
Upper part of the frame was mounted. In order to do so, the valve was closed, turbo wire and hose were disconnected and then connected. Valve was opened
again. See pictures 1-2.
Bottom part of the tent was constructed with 3 heaters (from one of the controllers) at the front, 4 in the middle, and 4 at the back (4+4 from |
Thu Nov 11 11:44:58 2021, RSS + ML OG + CB (remotely), CARME baking started    
|
With the help of OG, the baking tent was built. MG started baking around 11:30 am with a rate of 0.2 K/minute.
Heating update can be found on: https://web-docs.gsi.de/~lestinsk/baking.php (CARME temperature plot now visible as well - thanks Michael!)
where, device - 192.168.207.192 is for CARME. |
Wed Nov 10 18:24:12 2021, RSS, Thermocouple labelling  
|
1. Detector
2. Chamber back
3. Strain relief |
Tue Jul 25 09:12:15 2023, RSS, Building tent 
|
10:10 IE514 2.0e-08mbar
Upstream part of the CARME is covered. |
Wed Jul 26 08:28:09 2023, RSS, Building tent   
|
09:26 IE514 1.96e-08mbar |
Thu Jul 27 09:43:56 2023, RSS, Thermocouples connected -2 
|
10:30 IE514 1.80e-08mbar
Most of the CARME is covered by the baking tent. The tent needs to be closed and a bit covered from the front
(upstream), end (downstream), and bottom side. TCs are labeled with a marker in the sequence 1-1 to 2-8.
1-1 Internal TC 1
1-2 Internal TC 2
1-3 Internal TC 3
1-4 CARME front top
1-5 CARME front bottom
1-6 Top hanging middle
1-7 CARME middle |
Sun Jun 16 06:02:31 2024, RSS, Run 77 20x
|
Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
Tue Jun 3 14:54:29 2025, PMH, ST, Run 48 6x
|
Run 48 started. Everything is running again. We started at 3E13 at/cm2
D+ beam deuterium target. D+ beam energy is still 0.5 MeV/u. (beam calc calculation is 0.5143 MeV/u). See previous entry for beamcalc.
All four detectors positioned fully out and stationary, however we switched off detector #4. |
Tue Mar 1 17:36:04 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 18:43:41 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 19:40:28 2022, PM, LV, check 12x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 19:41:24 2022, PM, LV, target temperature walkthrough
|
A target temperature walkthrough has been initiated at 20:41 since the target density at S1 had slightly decreased (with ~0.1-0.2)
Current temprature 116K
set to 126K at 20:41 |
Tue Mar 1 20:41:28 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 21:34:06 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Thu Dec 8 14:41:19 2022, PJCS, Results of tests on AIDA PSU in DL T9 8x
|
We opened one up and soldered a co-ax cable to one of the +6v power contacts at the output of the filter board.
Connecting this to a 'scope we observed a level of +/- 5mv noise with no FEE connected.
Connecting one FEE made little difference. |
Wed Jan 18 13:32:36 2023, PJCS, MACB settings with either Emulator or VETAR   
|
When using the VITAR connected to the HDMI port of the root MACB the settings for all the MACB in the system 0x3.
This setting takes the Clock and Data line from the input HDMI and outputs it via teh HDMI output ports.
When using the Emulator connected via the SMA connectors on the back of the root MACB then the setting for the root MACB |
Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems
|
This is a suggested sequence of actions to help with the current problem with the White Rabbit timestamp distribution. Test the system between each intervention.
If a test provides an answer to the problem then proceed accordingly rather than continue with the suggestions.
Please sketch the current MACB wiring.
Unplug and replug the connectors of the VETAR HDMI connecting cable. If possible clean |
Wed Feb 23 22:29:50 2022, PE, EM, CB (remotely), check - 23:30
|
Motor position ok
Data rate: 1030kbytes/s
T ok |
Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
|
PB found pictures of the original dirty assembly, before screws and components were shipped to DL.
See attached. |
Mon Jan 31 08:58:38 2022, OH, TD, JM, centos server configuration 8x
|
Steps taken:
- MIDAS_Releases, Embedded and Exports files brought across from the previously working SL6 aida-gsi install. Brought as tar balls to preserve ownership
- dhcpd.conf set up with same IP addresses as used on the SL6 install from aida-gsi
|