146
|
Tue Nov 9 15:03:29 2021 |
RSS + OG | Burnt cables issues | Upper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then |
7x |
151
|
Thu Nov 11 11:44:58 2021 |
RSS + ML OG + CB (remotely) | CARME baking started | With the help of OG, the baking tent was
built. MG started baking around 11:30 am
with a rate of 0.2 K/minute. |
    |
149
|
Wed Nov 10 18:24:12 2021 |
RSS | Thermocouple labelling | 1. Detector
2. Chamber back
3. Strain relief |
  |
428
|
Tue Jul 25 09:12:15 2023 |
RSS | Building tent |
10:10 IE514 2.0e-08mbar
Upstream
part of the CARME is covered. |
 |
429
|
Wed Jul 26 08:28:09 2023 |
RSS | Building tent |
09:26 IE514 1.96e-08mbar |
   |
430
|
Thu Jul 27 09:43:56 2023 |
RSS | Thermocouples connected -2 |
10:30 IE514 1.80e-08mbar
Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered |
 |
639
|
Sun Jun 16 06:02:31 2024 |
RSS | Run 77 | Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
20x |
717
|
Tue Jun 3 14:54:29 2025 |
PMH, ST | Run 48 | Run 48 started. Everything is running again.
We started at 3E13 at/cm2
D+ beam deuterium target. D+ beam |
6x |
351
|
Tue Mar 1 17:36:04 2022 |
PM, LV | check | no change:
Check Clock Status': Passed
5, Failed 0 |
14x |
352
|
Tue Mar 1 18:43:41 2022 |
PM, LV | check | no change:
Check Clock Status': Passed
5, Failed 0 |
14x |
353
|
Tue Mar 1 19:40:28 2022 |
PM, LV | check | no change:
Check Clock Status': Passed
5, Failed 0 |
12x |
354
|
Tue Mar 1 19:41:24 2022 |
PM, LV | target temperature walkthrough | A target temperature walkthrough has been
initiated at 20:41 since the target density
at S1 had slightly decreased (with ~0.1-0.2) |
|
355
|
Tue Mar 1 20:41:28 2022 |
PM, LV | check | no change:
Check Clock Status': Passed
5, Failed 0 |
14x |
356
|
Tue Mar 1 21:34:06 2022 |
PM, LV | check | no change:
Check Clock Status': Passed
5, Failed 0 |
14x |
384
|
Thu Dec 8 14:41:19 2022 |
PJCS | Results of tests on AIDA PSU in DL T9 | We opened one up and soldered a co-ax cable
to one of the +6v power contacts at the output
of the filter board. |
8x |
385
|
Wed Jan 18 13:32:36 2023 |
PJCS | MACB settings with either Emulator or VETAR | When using the VITAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3. |
   |
478
|
Sat Jan 27 20:38:15 2024 |
PJCS | [INFO] Steps to diagnose White Rabbit problems | This is a suggested sequence of actions
to help with the current problem with the
White Rabbit timestamp distribution. Test |
|
263
|
Wed Feb 23 22:29:50 2022 |
PE, EM, CB (remotely) | check - 23:30 | Motor position ok
Data rate: 1030kbytes/s
T ok |
|
109
|
Wed Oct 6 09:39:59 2021 |
PB CB | Original dirty assembly of CARME internals | PB found pictures of the original dirty assembly,
before screws and components were shipped
to DL.
|
7x |
182
|
Mon Jan 31 08:58:38 2022 |
OH, TD, JM | centos server configuration | Steps taken:
- MIDAS_Releases, Embedded and Exports files
brought across from the previously working |
8x |