AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 12 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Nov 9 15:03:29 2021, RSS + OG, Burnt cables issues 7x
Entry  Thu Nov 11 11:44:58 2021, RSS + ML OG + CB (remotely), CARME baking started IMG_5535.JPGIMG_5537.JPGIMG_5531.JPGIMG_5534.JPGIMG_5539.JPG
Entry  Wed Nov 10 18:24:12 2021, RSS, Thermocouple labelling labeling.JPG.svgLabelling.svgIMG_5512.JPG
Entry  Tue Jul 25 09:12:15 2023, RSS, Building tent BD01C0C8-5181-49B8-8751-AD4C99A459CC.jpeg7B3836F1-8A7E-491B-AFDC-46033BF84760.jpeg
Entry  Wed Jul 26 08:28:09 2023, RSS, Building tent IMG_9897.jpgIMG_9899.jpgIMG_9901.jpgIMG_9902.jpg
Entry  Thu Jul 27 09:43:56 2023, RSS, Thermocouples connected -2 IMG_9920.jpgIMG_9919.jpg
Entry  Sun Jun 16 06:02:31 2024, RSS, Run 77 20x
Entry  Tue Jun 3 14:54:29 2025, PMH, ST, Run 48 6x
Entry  Tue Mar 1 17:36:04 2022, PM, LV, check 14x
Entry  Tue Mar 1 18:43:41 2022, PM, LV, check 14x
Entry  Tue Mar 1 19:40:28 2022, PM, LV, check 12x
Entry  Tue Mar 1 19:41:24 2022, PM, LV, target temperature walkthrough 
Entry  Tue Mar 1 20:41:28 2022, PM, LV, check 14x
Entry  Tue Mar 1 21:34:06 2022, PM, LV, check 14x
Entry  Thu Dec 8 14:41:19 2022, PJCS, Results of tests on AIDA PSU in DL T9 8x
Entry  Wed Jan 18 13:32:36 2023, PJCS, MACB settings with either Emulator or VETAR macb_apr20.jedmacb_apr20.vhdzybo.jpgMACB.jpg
Entry  Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems 
Entry  Wed Feb 23 22:29:50 2022, PE, EM, CB (remotely), check - 23:30 
Entry  Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
Entry  Mon Jan 31 08:58:38 2022, OH, TD, JM, centos server configuration 8x
ELOG V3.1.4-unknown