AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 1 of 35  ELOG logo
  ID Datedown Author Subject Text Attachments
  688   Fri May 23 09:19:40 2025 SN, TDFriday 23 May 2025
10.12 DAQ, Merger & Tape Server running OK
- no storage mode 
 18x 
  687   Thu May 22 06:41:10 2025 JG, TDR6 - R11 scrapers test / pulser walk07.00 

JG found target off (target data stopped
 33x 
  686   Wed May 21 14:38:22 2025 JM, TDR4 and R5 - background15:30

Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished
 7x 
  685   Tue May 20 19:38:36 2025 JMCARME restart19:00

Arrived at GSI.

We have 6Li1+ beam in the ring
 6x 
  684   Sat May 17 11:19:06 2025 JMShifter intructions 2025EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  683   Tue May 13 15:07:42 2025 JMOnline monitoring codeCARME_Sort histogramming has been updated
to aid our understanding online.

> XY plots have been updated
 Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png 
  682   Mon May 12 13:25:09 2025 JGtarget/ring DAQ - overviewAn MBS DAQ is running to collect two types
of data:
  
  681   Sat Apr 26 22:01:37 2025 CBProxy bridgeProxy bridge enabling anydesk and generic
Internet access dropped due to atppc025 being
rebooted. Found it dropped again late today.
  
  680   Wed Apr 23 11:08:34 2025 TD, JMBackground Run
12.08 DSSSD bias & leakage current - attachments
1-2
 11x 
  679   Tue Apr 22 06:44:02 2025 TDTuesday 22 April
07.40 DSSSD bias & leakage current - attachments
1-3
 Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png 
  678   Sun Apr 20 07:30:29 2025 CBDSSD leakage currents over EasterJust after midnight on 20/04 it appears
DSSD #4 leakage current has perfectly stabilised.
See attached.
 Screenshot_2025-04-20_083007.pngScreenshot_2025-04-20_193226.pngScreenshot_2025-04-21_085130.png 
  677   Fri Apr 18 16:18:33 2025 JMD+D BBN energies testD+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold
 16x 
  676   Fri Apr 18 08:17:38 2025 JMMore testing09:10

Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating.
 15x 
  675   Thu Apr 17 08:51:29 2025 JMGrounding cont.09:00

Came in to see the bias for DSSD4
which has been fluctuating for the past few
 29x 
  674   Wed Apr 16 08:20:05 2025 JMGrounding 09:00

Leakage currents this morning again
appear to have lowered during the night.
 14x 
  673   Tue Apr 15 12:23:10 2025 JMLeakage current / CARME issues14/04/25

Arrived at GSI in the afternoon.

Found that the coolant loop on
 18x 
  672   Thu Apr 10 10:53:14 2025 TDThursday 10 April11.50 DAQ continues
      Data file APR25/R6_13
 8x 
  671   Thu Apr 10 07:02:12 2025 CB (remotely)Current logging enabled - sort ofThere appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns
  
  670   Wed Apr 9 10:02:21 2025 TDCARME equipment in CRYRING area moved
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation
 20250409_102115.jpg20250409_101705.jpg 
  669   Wed Apr 9 02:40:04 2025 TDWednesday 9 April03.37 DAQ continues
      Data file APR25/R5_8
 11x 
ELOG V3.1.4-unknown