AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 2 of 38  ELOG logo
Entry  Fri Feb 25 03:01:11 2022, Rui-Jiu Chen, Alex, check 14x
Still  no beam in CRING.

Motor fully out position.

SW3
Entry  Fri Feb 25 05:04:16 2022, Rui-Jiu Chen, Alex, check 14x
Still  no beam in CRING.

Motor fully out position.

SW3
Entry  Fri Feb 25 16:01:04 2022, MS, PJW, check 7x
        

'Check Clock Status': Clock status test result: Passed 5, Failed 0

'Check ADC Calibration' : Calibration test result: Passed 5, Failed 0
Entry  Fri Feb 25 17:48:22 2022, MS, PJW, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes

 
Entry  Fri Feb 25 19:20:22 2022, MS, PJW, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status'  no changes

 
Entry  Tue Mar 1 06:35:42 2022, SHB, MS, check 11x
detector motors are still out

'Check Clock Status', 'Check ADC Calibration' : Clock status test result: Passed 5, Failed 0

'Check the White rabbit decoder status' :  
Entry  Tue Mar 1 08:02:26 2022, SHB, MS, check 11x
 

'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes
Entry  Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': no change
Entry  Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' : no change
Entry  Tue Mar 1 17:36:04 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 18:43:41 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 19:40:28 2022, PM, LV, check 12x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 20:41:28 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Tue Mar 1 21:34:06 2022, PM, LV, check 14x
no change:

Check Clock Status': Passed 5, Failed 0

Check ADC Calibration: Passed 5, Failed 0
Entry  Mon Jan 31 08:58:38 2022, OH, TD, JM, centos server configuration 8x
Steps taken:
- MIDAS_Releases, Embedded and Exports files brought across from the previously working SL6 aida-gsi install. Brought as tar balls to preserve ownership
- dhcpd.conf set up with same IP addresses as used on the SL6 install from aida-gsi
Entry  Sat Jun 7 10:23:26 2025, JM, CB, carme-gsi rebooted  
10:00

The computer screen controlling the DAQ on carme-gsi appeared to have crashed.

Unable to move throught the different windows etc.
Entry  Sat Jul 5 08:51:33 2025, EBM, anydesk connection settings anydesk_settings.png
 
Entry  Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems 
This is a suggested sequence of actions to help with the current problem with the White Rabbit timestamp distribution. Test the system between each intervention.
If a test provides an answer to the problem then proceed accordingly rather than continue with the suggestions.


Please sketch the current MACB wiring.
Unplug and replug the connectors of the VETAR HDMI connecting cable. If possible clean
Entry  Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed
This is how to update the MACB firmware using the opensource tool xc3sprog

Entry  Wed Oct 13 11:59:23 2021, TD, [How to] Open COF600 copper wire seals 20211013_103806.jpg20211013_103800.jpg

Use the M10 jacking points provided top/bottom and 
left/right on the upstream and downstream sides of the 
ELOG V3.1.4-unknown