AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 2 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Author Subjectdown Text Attachments
  275   Fri Feb 25 03:01:11 2022 Rui-Jiu Chen, AlexcheckStill  no beam in CRING.

Motor fully out position.

SW3
 14x 
  277   Fri Feb 25 05:04:16 2022 Rui-Jiu Chen, AlexcheckStill  no beam in CRING.

Motor fully out position.

SW3
 14x 
  284   Fri Feb 25 16:01:04 2022 MS, PJWcheck        

'Check Clock Status': Clock
status test result: Passed 5, Failed 0
 7x 
  285   Fri Feb 25 17:48:22 2022 MS, PJWcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status' - no changes
 11x 
  286   Fri Feb 25 19:20:22 2022 MS, PJWcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status'  no changes
 11x 
  343   Tue Mar 1 06:35:42 2022 SHB, MScheckdetector motors are still out

'Check Clock Status', 'Check
ADC Calibration' : Clock status test
 11x 
  344   Tue Mar 1 08:02:26 2022 SHB, MScheck 

'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
 11x 
  347   Tue Mar 1 12:33:21 2022 MS, SHBcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status': no change
 11x 
  349   Tue Mar 1 14:01:01 2022 MS, SHBcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status' : no change
 11x 
  351   Tue Mar 1 17:36:04 2022 PM, LVcheckno change:

Check Clock Status': Passed
5, Failed 0
 14x 
  352   Tue Mar 1 18:43:41 2022 PM, LVcheckno change:

Check Clock Status': Passed
5, Failed 0
 14x 
  353   Tue Mar 1 19:40:28 2022 PM, LVcheckno change:

Check Clock Status': Passed
5, Failed 0
 12x 
  355   Tue Mar 1 20:41:28 2022 PM, LVcheckno change:

Check Clock Status': Passed
5, Failed 0
 14x 
  356   Tue Mar 1 21:34:06 2022 PM, LVcheckno change:

Check Clock Status': Passed
5, Failed 0
 14x 
  182   Mon Jan 31 08:58:38 2022 OH, TD, JMcentos server configurationSteps taken:
- MIDAS_Releases, Embedded and Exports files
brought across from the previously working
 8x 
  725   Sat Jun 7 10:23:26 2025 JM, CBcarme-gsi rebooted 10:00

The computer screen controlling
the DAQ on carme-gsi appeared to have crashed.
  
  759   Sat Jul 5 08:51:33 2025 EBManydesk connection settings   anydesk_settings.png 
  478   Sat Jan 27 20:38:15 2024 PJCS[INFO] Steps to diagnose White Rabbit problemsThis is a suggested sequence of actions
to help with the current problem with the
White Rabbit timestamp distribution. Test
  
  482   Tue Jan 30 14:04:30 2024 NH[HowTo] Update MACB FirmwareThis is how to update the MACB firmware using
the opensource tool xc3sprog
 xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed 
  119   Wed Oct 13 11:59:23 2021 TD[How to] Open COF600 copper wire seals
Use the M10 jacking points provided top/bottom
and 
 20211013_103806.jpg20211013_103800.jpg 
ELOG V3.1.4-unknown