AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 7 of 36  ELOG logo
  ID Date Authordown Subject Text Attachments
  672   Thu Apr 10 10:53:14 2025 TDThursday 10 April11.50 DAQ continues
      Data file APR25/R6_13
 8x 
  679   Tue Apr 22 06:44:02 2025 TDTuesday 22 April
07.40 DSSSD bias & leakage current - attachments
1-3
 Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png 
  695   Tue May 27 08:38:29 2025 TD[How To] Recover DAQ when one FEE64 stops sending data - short(er) version 1) Select 'No Storage' [workspace 4, display
1, browser tab 'TapeServer']
    If already in 'No Storage' mode please
  
  708   Sat May 31 10:46:42 2025 TDRun 38 - remote monitoring
11.40 DAQ continues
      File G22-205/R38
 21x 
  362   Wed Mar 2 06:00:49 2022 Spillmann, Uwewaiting07:00
Target density is hovering between
2.0e-8 and 2.3e-8
  
  363   Wed Mar 2 09:38:50 2022 Spillmann, Uweion source restarted 

detector position

out: 23.1mm
  
  688   Fri May 23 09:19:40 2025 SN, TDTarget wait, switch lithium oven
10.12 DAQ, Merger & Tape Server running OK
- no storage mode 
 18x 
  342   Tue Mar 1 06:04:04 2022 SHB, MSpositionsjust FYI: current positions saved in files
are x=1000 and y=-750. this information is
good in case of crash.
  
  343   Tue Mar 1 06:35:42 2022 SHB, MScheckdetector motors are still out

'Check Clock Status', 'Check
ADC Calibration' : Clock status test
 11x 
  344   Tue Mar 1 08:02:26 2022 SHB, MScheck 

'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
 11x 
  530   Mon Feb 19 06:01:17 2024 SHB, JM, JGRun 42 morning shift07:00

Observed reduction in YR09 presure
over last few hours in ML online plot. Beam
 6x 
  220   Mon Feb 21 18:03:58 2022 SHB, JM, CB, OH (remotely)Info: signals on ion intensity for experimentCurrently 4 possibilities to have a look
at the beam, all of them are OK to check
whether there is beam or not, but some of
  
  221   Mon Feb 21 20:56:51 2022 SHB, JM, CB, OH (remotely)DAQ connection for ion currentsignals from ICT and CRYRADIO are now connected
to AIDA2 and AIDA5 respectively. ICT is set
to factor 200 and CRYRADIO to 40 for now.
 cry.jpg 
  222   Mon Feb 21 21:04:08 2022 SHB, JM, CB, OH (remotely)Schottky RF view from the beam inside   pio-2022.02.21.21.54.46.895.PNG 
  580   Mon Jun 3 11:46:07 2024 SD, SHB, JM, CN, EMRun 2712:46 (attachments 1-4)

Run 27 started - Beam no target

Beam energy = 3 MeV
 12x 
  579   Mon Jun 3 08:43:22 2024 SD, SHBRun 2609:44

Run 26 started - Beam no target

Beam energy is being increased
 8x 
  306   Sun Feb 27 14:05:30 2022 Rui-Jiu, RaganCurrent statusRing current ~7.61e7 particles/s

SW3

- Merger OK
 14x 
  307   Sun Feb 27 15:02:16 2022 Rui-Jiu Chen, YuriChange target temperature16:00 change temperature from 95 k to 120k.

16:07 change temperature from 120
k to 95k.
 14x 
  308   Sun Feb 27 15:41:33 2022 Rui-Jiu Chen, Yuricurrent status16:38 change target temperature from 95
k to 140 k.

16:48 change target temperature
 13x 
  309   Sun Feb 27 16:30:35 2022 Rui-Jiu Chen, YuriChange target temperature again1. change T from 95 k to 140 k.

2. keep T at 140k for 15 minutes.

3. change T from 140 k to 95 k.
  
ELOG V3.1.4-unknown