Entry  Sun Feb 27 16:30:35 2022, Rui-Jiu Chen, Yuri, Change target temperature again 
1. change T from 95 k to 140 k.

2. keep T at 140k for 15 minutes.

3. change T from 140 k to 95 k.
Entry  Sun Feb 27 17:00:45 2022, Rui-Jiu Chen, Yuri, current status 13x
Ring current ~7.76e7 particles/s

SW3

- Merger OK
Entry  Sun Feb 27 18:46:42 2022, Rui-Jiu Chen, Yuri, Change target temperature 
time              Temperature            
E1 current(A)                 E1 frequency(Hz)

19:06           170                          
Entry  Sun Feb 27 19:01:02 2022, Rui-Jiu Chen, Yuri, Current status 13x
Ring current ~5.96e7 particles/s

SW3

- Merger OK
Entry  Sun Feb 27 20:19:06 2022, Rui-Jiu Chen, Yuri, open the valves of target. 
 
Entry  Sun Feb 27 20:38:06 2022, Rui-Jiu Chen, Yuri, Current status 13x
Ring current ~5.0e7 particles/s

SW3

- Merger OK
Entry  Fri Feb 25 01:12:49 2022, Rui-Jiu Chen, Alex , Check  13x
Still  no beam in CRING.

Motor fully out position.

SW3
Entry  Thu Feb 24 23:15:25 2022, Rui-Jiu Chen, Alex, Problems with ion souce. 
 
Entry  Fri Feb 25 00:00:40 2022, Rui-Jiu Chen, Alex, Check 14x
There are some problems with ion source.  No beam in CRYING.

Motor fully out position.

SW3
Entry  Fri Feb 25 03:01:11 2022, Rui-Jiu Chen, Alex, check 14x
Still  no beam in CRING.

Motor fully out position.

SW3
Entry  Fri Feb 25 03:20:29 2022, Rui-Jiu Chen, Alex, Current status 
Gleb Vorobyev tried for few hours to fix the ion source but without success.

So, there will be no beam in CRYRING during this night shift. Today at about 08:00 the efforts to fix the ion source will be restarted.
Entry  Fri Feb 25 05:04:16 2022, Rui-Jiu Chen, Alex, check 14x
Still  no beam in CRING.

Motor fully out position.

SW3
Entry  Wed Jun 12 07:16:47 2024, RSS, YL, JM, TD, CB, Status 6x
07:56 Gleb has taken the beam to try settings for the 5+ charge state. As soon as the target is ready, the 1+ charge state will be given back.

Detectors have been moved out for safety


08:10
      Run 63
   
      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

    
Entry  Wed May 10 19:06:18 2023, RSS, TD, V-I test detector_1.pngdetector_2.pngdetector_3.pngdetector_4.png
To test the detectors, adaptors were installed on the feed through flanges. A negative bias voltage was applied in steps of 10 V from 0 to 150 V. The
V-I plots are attached for the four detectors. Three detectors - top right, top left, and bottom left (in the direction of the beam) - are fine. For the
bottom right detector (in the direction of the beam), the current was fluctuating and was considerably high (1st test). The adaptors connecting to this
Entry  Thu May 11 21:22:54 2023, RSS, TD, V-I test 7x
Today, the foil was opened, the pins on the bottom right detector were checked and looked fine, the right-hand arm was moved a bit in and then out, and
the foil was tightly closed again. The negative bias voltage was applied from 0 to 50 V in steps of 10 V. During the measurement, the lights in the cave
were switched off to ensure no leakage current from the light*. The results are shown in Attachment 1. To condition the detector, it was left at a negative
Entry  Fri May 12 16:24:20 2023, RSS, TD, V-I test 8x
Since yesterday evening, the bottom right detector was at -150 V. In the morning, the current was quite stable ~ 6.77 uA. The bias was switched off,
the foils opened, both of the detector arms were moved in and out three times, and the chamber was tightly covered again. A negative bias voltage was applied
from 0 to 150 V in steps of 10 V one by one to all four detectors, and the V-I results can be seen in Attachments 1-4. All detectors seem to be
Entry  Sat Jul 22 09:19:59 2023, RSS, TD, Thermocouples connected 10x
10.20 Pirani 1e-03mbar IE514 3.26e-08mbar

Entry  Sun Jul 23 10:13:48 2023, RSS, TD, Building tent DBE0DA2E-2F69-469C-B645-3E33E3D82138.jpeg857185AC-3571-41E9-88AE-9F624445135B.jpegE69ED1D1-444E-478A-A3B4-481023B4024D.jpeg610048A3-25F5-459C-9EF1-83EFEFDE51C9.jpeg
11.15 Pirani 1.0e-03mbar IE514 2.72e-08mbar

16.35 Pirani 1.0e-03mbar IE514 2.61e-08mbar
Entry  Mon Jul 24 10:40:14 2023, RSS, TD, Pump down continues vacplot.pngvacplot24.png
11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar

15.15 7d/24h vacuum plots
Entry  Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54  9x
01:00

Beam optimisation since 09:25.

Target ON and open to the ring