ID |
Date |
Author |
Subject |
Text |
 |
690
|
Sat May 24 18:27:55 2025 |
EM, LC, J. M. | Sunday 25 May 2025 | 19:27 Data file R17 running
DSSSD positions out. Nikos will work on the |
30x |
689
|
Sat May 24 08:28:14 2025 |
TD, EM | Saturday 24 May 2025 |
09.27 DAQ going
Switch from 'no storage' mode - alpha |
29x |
688
|
Fri May 23 09:19:40 2025 |
SN, TD | Friday 23 May 2025 |
10.12 DAQ, Merger & Tape Server running OK
- no storage mode
|
18x |
687
|
Thu May 22 06:41:10 2025 |
JG, TD | R6 - R11 scrapers test / pulser walk | 07.00
JG found target off (target data stopped |
33x |
686
|
Wed May 21 14:38:22 2025 |
JM, TD | R4 and R5 - background | 15:30
Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished |
7x |
685
|
Tue May 20 19:38:36 2025 |
JM | CARME restart | 19:00
Arrived at GSI.
We have 6Li1+ beam in the ring |
6x |
684
|
Sat May 17 11:19:06 2025 |
JM | Shifter intructions 2025 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
683
|
Tue May 13 15:07:42 2025 |
JM | Online monitoring code | CARME_Sort histogramming has been updated
to aid our understanding online.
> XY plots have been updated |
  |
682
|
Mon May 12 13:25:09 2025 |
JG | target/ring DAQ - overview | An MBS DAQ is running to collect two types
of data:
|
|
681
|
Sat Apr 26 22:01:37 2025 |
CB | Proxy bridge | Proxy bridge enabling anydesk and generic
Internet access dropped due to atppc025 being
rebooted. Found it dropped again late today. |
|
680
|
Wed Apr 23 11:08:34 2025 |
TD, JM | Background Run |
12.08 DSSSD bias & leakage current - attachments
1-2
|
11x |
679
|
Tue Apr 22 06:44:02 2025 |
TD | Tuesday 22 April |
07.40 DSSSD bias & leakage current - attachments
1-3
|
    |
678
|
Sun Apr 20 07:30:29 2025 |
CB | DSSD leakage currents over Easter | Just after midnight on 20/04 it appears
DSSD #4 leakage current has perfectly stabilised.
See attached. |
  |
677
|
Fri Apr 18 16:18:33 2025 |
JM | D+D BBN energies test | D+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold |
16x |
676
|
Fri Apr 18 08:17:38 2025 |
JM | More testing | 09:10
Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating. |
15x |
675
|
Thu Apr 17 08:51:29 2025 |
JM | Grounding cont. | 09:00
Came in to see the bias for DSSD4
which has been fluctuating for the past few |
29x |
674
|
Wed Apr 16 08:20:05 2025 |
JM | Grounding | 09:00
Leakage currents this morning again
appear to have lowered during the night. |
14x |
673
|
Tue Apr 15 12:23:10 2025 |
JM | Leakage current / CARME issues | 14/04/25
Arrived at GSI in the afternoon.
Found that the coolant loop on |
18x |
672
|
Thu Apr 10 10:53:14 2025 |
TD | Thursday 10 April | 11.50 DAQ continues
Data file APR25/R6_13
|
8x |
671
|
Thu Apr 10 07:02:12 2025 |
CB (remotely) | Current logging enabled - sort of | There appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns |
|
670
|
Wed Apr 9 10:02:21 2025 |
TD | CARME equipment in CRYRING area moved |
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation |
 |
669
|
Wed Apr 9 02:40:04 2025 |
TD | Wednesday 9 April | 03.37 DAQ continues
Data file APR25/R5_8
|
11x |
668
|
Tue Apr 8 10:46:13 2025 |
TD | Tuesday 8 April |
11.30 CRYRING vacuum and temperature - attachments
1-2
|
27x |
667
|
Mon Apr 7 08:59:41 2025 |
TD | Monday 7 April |
10.00 FEE64 power ON
CARME IE514 OFF
|
8x |
666
|
Sun Apr 6 14:21:53 2025 |
TD | [How To] Startup CARME |
- water flow/interlock checks
check water flow to/from inflow/outflow |
|
665
|
Sun Apr 6 11:40:48 2025 |
TD | Options DB reconstructed | Options directory corrupted unable to change
Options settings per https://elog.ph.ed.ac.uk/CARME/664
|
|
664
|
Sun Apr 6 10:17:49 2025 |
TD | Sunday 6 April |
11.15 CARME IE514 ion gauge remains OFF
ML says there are 2x ion gauges with |
15x |
663
|
Sat Apr 5 16:15:04 2025 |
TD | FEE64 power interlock installed |
Water flow and dew point sensors have been
installed on the outlet and inlet cooling |
11x |
662
|
Sat Apr 5 16:13:32 2025 |
TD | Saturday 5 April |
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
7x |
661
|
Fri Apr 4 10:17:16 2025 |
TD | Friday 4 April |
10.43 Reboot carme-gsi - unable to open a
working terminal
|
|
660
|
Mon Mar 10 15:47:27 2025 |
TD | Analysis data files G22-201 R79_10 & R79_24 |
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
|
 |