  762   Thu Jul 17 07:07:56 2025 CBCARME off08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still
 Capture.PNG2.PNG3.PNGCapture.PNG 
  761   Wed Jul 9 11:21:14 2025 EW, CBCARME restarted - long background R98---9 July---

11:00

Turned detectors on - all stable
 32x 
  760   Sun Jul 6 11:35:28 2025 CBAnydesk version updatedUpdated anydesk to 6.3.2 CentOS7 release.

Works now.
  
  759   Sat Jul 5 08:51:33 2025 EBManydesk connection settings   anydesk_settings.png 
  758   Wed Jun 18 14:21:39 2025 CBCARME off15:20

DAQ stopped

Merger & Tape Server stopped
 Screenshot_from_2025-06-18_15-18-31.png 
  757   Tue Jun 17 23:51:58 2025 TD, CB, JGRun 96 - continued
00.31 DAQ continues data file G22-205/R96_27
      
 23x 
  756   Tue Jun 17 19:10:07 2025 NH, PMHRun 9620:00 - Go to YR cave to see what is going
on
 7x 
  755   Tue Jun 17 12:22:50 2025 CB EW JG AG SNRun 94/95/96Run 94

Background with beam at 150 keV
and no target.
 G35Voltage.pdf 
  754   Tue Jun 17 12:14:30 2025 EW, CB, AGRun 93- Background with beam 150keVRun 93- New run at 150keV, background with
beam

13:15 All checks ok
 Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png 
  753   Tue Jun 17 08:04:09 2025 EW, AG, CBRun 92- Background with beam 90keVRun 92- started at 09:00, background with
beam

Same settings as run 91
 Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png 
  752   Mon Jun 16 22:06:00 2025 CB, AR, EWRUN 90-9123:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45
 14x 
  751   Mon Jun 16 21:58:00 2025 CB ARRuns 84-89Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal,
  
  750   Mon Jun 16 11:12:22 2025 JG, AK, AR, EHrun 8312:15 restarted measurement with target
- Run 83

same settings as for runs 76, 77
 8x 
  749   Mon Jun 16 10:46:11 2025 CB JM JG AKRun82Background without beam while source is
optimised.
  
  748   Mon Jun 16 08:17:41 2025 JGD2 consumptionThe current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar.
  
  747   Sun Jun 15 10:46:35 2025 EW, EM, AR, AB, CB, JG, AKRun 8111:45 New run started - run 81, same settings
as previous runs (75, 76 etc)

ROOT histograms NOT zeroed
 30x 
  746   Sun Jun 15 07:01:37 2025 EW, EMRun 8008:00 New run started - run 80

Run whilst they are optimising
the beam after losing it, everything else
 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png 
  745   Fri Jun 13 19:41:32 2025 JG, SHB, JM, AR, EW, OFRun 77, 78, 79New run started - Run 77 after refilling
LN2 dewar

Same settings as Run 75 & 76
 17x 
  744   Fri Jun 13 16:39:18 2025 JG, SHBRun 76Same settings as run 75.

Detector 4 is biased at 100V and
switched from MEC to LEC.
 7x 
  743   Fri Jun 13 14:45:58 2025 JG, SS, JM, CB, EW, ARRun 75 

90 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt 
  742   Thu Jun 12 15:33:17 2025 CB, JM, EM, JG, TD, AB, CF, ARRun 7416:34

Like Run 73, but particle detector
in YR10 now active, and recorded in MBS.
 27x 
  741   Thu Jun 12 14:22:27 2025 JM, CB, TD, CF, JG, EMRun 7315:00

Cave closed, waiting for beam to
come back.
 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png 
  740   Thu Jun 12 14:08:42 2025 JM, CBRun 72 - pulser walkthroughPulser walkthrough conducted while the
cave was open.

Pulser amplitudes 90000, 80000,
 Screenshot_from_2025-06-12_15-33-03.png 
  739   Thu Jun 12 06:20:50 2025 JMRun 68,69 - background07:20

Started a background run while
the cave is open.
 Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png 
  738   Wed Jun 11 10:13:42 2025 EW, CB, PJW, AR, JMRun 67As run 66, optimisation of beam completed

DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC
 14x 
  737   Wed Jun 11 09:16:55 2025 CBASIC Control Settings11 June 10:18

2025Apr08-13.45.30 settings

DSSD4 not working as of the screenshots
 17x 
  736   Wed Jun 11 08:37:48 2025 CB, PJWRun 6609:38

As Run 65, no changes, CRYRING
operators attempting to improve beam intensity.
 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png 
  735   Tue Jun 10 22:38:59 2025 JM, CB, PJWRun 6523:40

Offline anlaysis shows two clear
peaks for DSSD1 and 2 at very low energies
 7x 
  734   Tue Jun 10 16:46:39 2025 JM, CB, EW, AY, PC150 keV - Run64Run 64 started.

150 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 42x 
  733   Tue Jun 10 13:29:23 2025 EW, CB, JMThresholds changed Experimented with slow comparator thresholds
as we go down to lower beam energies

Checked deadlayer loses with SRIM,
 Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png 
  732   Tue Jun 10 09:57:50 2025 CB, JM, PJW, YuL, JGRun 6210:58

As Run 61, no target for background.

200 keV/A
  
  731   Tue Jun 10 09:44:33 2025 JGMBS not running for a weekThe MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)

This means, no detector and target
  
  730   Tue Jun 10 09:44:30 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  729   Tue Jun 10 09:44:20 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  728   Sun Jun 8 11:55:00 2025 EM, PC, JM, CB, EW, AY, CB, PJW, YuLRun 58,59,60, 6112:52 

Started Run 58 - Beam energy
200 keV/u.
 50x 
  727   Sun Jun 8 10:05:30 2025 EM, PC, JMRun5711:06

Run during beam change. We will
go down to 200 keV/u
  
  726   Sun Jun 8 09:07:22 2025 EM, PC, JMRun56NOTE: RunR55 is missing

Run56: Background run with 250
keV/u. Target off using the usual procedure.
 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png 
  725   Sat Jun 7 10:23:26 2025 JM, CBcarme-gsi rebooted 10:00

The computer screen controlling
the DAQ on carme-gsi appeared to have crashed.
  
  724   Sat Jun 7 10:06:27 2025 JM, EM, CB, DB, AY, PC, CBRun 5411:10

We have started a new run at the
same energy as R53 (250 keV/u) due to an
 50x 
  723   Fri Jun 6 17:27:03 2025 AY, ST, JM, EM, DBRun 53Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2.
 11x 
  722   Fri Jun 6 16:49:59 2025 CB, AY, STBeam overlap results for 200keV and 250keVFor 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal
 2025_06_06_17_46_56_Greenshot.png 
  721   Thu Jun 5 16:54:18 2025 EW, ST, CBRun 52 - 0.3 MeV/ARun 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam
 14x 
  720   Thu Jun 5 08:50:00 2025 JM, CF, CB, EWRun 51 - background09:49

DSSD4 has been biased to 100V in
steps of 5V from 60V. It was previously stable
 Screenshot_from_2025-06-05_09-38-05.pngScreenshot_from_2025-06-05_09-46-08.pngScreenshot_from_2025-06-05_09-51-43.png 
  719   Wed Jun 4 10:44:36 2025 EW, CB, JM, OF, JG, STRun 50 - 0.35 MeV/A11:30

Run 50 started.

D+ beam deuterium target. D+ beam
 13x 
  718   Wed Jun 4 00:10:39 2025 JMRun 49 - beam only01:10

Gas target turned off via the shutter
valve.
 6x 
  717   Tue Jun 3 14:54:29 2025 PMH, STRun 48Run 48 started. Everything is running again.
We started at 3E13 at/cm2

D+ beam deuterium target. D+ beam
 6x 
  716   Tue Jun 3 11:16:07 2025 EW, EM, JMRun 47, beam only backgroundRun 47 started. Target cooling down after
water cooler failure, beam only background

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png 
  715   Mon Jun 2 20:03:43 2025 JG, AG, CB, EW, EMRun 45/46, 0.5 MeV/ARun 45 started.

D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation
 13x 
  714   Mon Jun 2 17:48:07 2025 JG, AGRun 44 scraper testsSame settings are Run 43 but with coasting
beam and scrapers set to:  30 / - 30
mm.
 Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png 
  713   Mon Jun 2 17:25:31 2025 JG, AGRun 43 scraper testsSame settings are Run 42 but bunched beam
and scrapers set to:  30 / - 30 mm.

 
  
  712   Mon Jun 2 16:35:35 2025 EW, AGRun 42 and scraper tests17:00

Scraper tests conducted. We tried
moving in the scrapers both at a fixed position
 Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png 
  711   Mon Jun 2 09:30:38 2025 JM, EW, STRun 41Run 41 started.

D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation
 6x 
  710   Sun Jun 1 15:33:50 2025 EW, JM, CBRun 4016:30

Run 40 started.

D+ beam deuterium target. D+ beam
 10x 
  709   Sun Jun 1 07:46:34 2025 JM, EM, CBRun 3908:45

Run 39 started.

D+ beam deuterium target. D+ beam
 7x 
  708   Sat May 31 10:46:42 2025 TDRun 38 - remote monitoring
11.40 DAQ continues
      File G22-205/R38
 21x 
  707   Sat May 31 09:58:21 2025 JMRun 3810:56

Run 38 started.

D+ beam deuterium target. D+ beam
 10x 
  706   Fri May 30 21:49:08 2025 JM, NP, CBRun 3722:49

Run 37 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png 
  705   Fri May 30 20:47:47 2025 JM, CB, NPRun 3621:47

Run 36 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png 
  704   Fri May 30 20:06:48 2025 JM, CB, NPRun3521:00

Run 35 started.

D+ beam deuterium target. D+ beam
 8x 
  703   Fri May 30 07:27:41 2025 CB LB JM NP EMWaiting for deuterium08:27

No run going.

Temperatures OK - attach
 8x 