762
|
Thu Jul 17 07:07:56 2025 |
CB | CARME off | 08:07 CEST
Temperatures ok - attached
DSSDs on. Leakage currents still |
   |
|
761
|
Wed Jul 9 11:21:14 2025 |
EW, CB | CARME restarted - long background R98 | ---9 July---
11:00
Turned detectors on - all stable |
32x |
|
760
|
Sun Jul 6 11:35:28 2025 |
CB | Anydesk version updated | Updated anydesk to 6.3.2 CentOS7 release.
Works now. |
|
|
759
|
Sat Jul 5 08:51:33 2025 |
EBM | anydesk connection settings | |
|
|
758
|
Wed Jun 18 14:21:39 2025 |
CB | CARME off | 15:20
DAQ stopped
Merger & Tape Server stopped |
|
|
757
|
Tue Jun 17 23:51:58 2025 |
TD, CB, JG | Run 96 - continued |
00.31 DAQ continues data file G22-205/R96_27
|
23x |
|
756
|
Tue Jun 17 19:10:07 2025 |
NH, PMH | Run 96 | 20:00 - Go to YR cave to see what is going
on
|
7x |
|
755
|
Tue Jun 17 12:22:50 2025 |
CB EW JG AG SN | Run 94/95/96 | Run 94
Background with beam at 150 keV
and no target. |
|
|
754
|
Tue Jun 17 12:14:30 2025 |
EW, CB, AG | Run 93- Background with beam 150keV | Run 93- New run at 150keV, background with
beam
13:15 All checks ok |
   |
|
753
|
Tue Jun 17 08:04:09 2025 |
EW, AG, CB | Run 92- Background with beam 90keV | Run 92- started at 09:00, background with
beam
Same settings as run 91 |
   |
|
752
|
Mon Jun 16 22:06:00 2025 |
CB, AR, EW | RUN 90-91 | 23:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45 |
14x |
|
751
|
Mon Jun 16 21:58:00 2025 |
CB AR | Runs 84-89 | Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal, |
|
|
750
|
Mon Jun 16 11:12:22 2025 |
JG, AK, AR, EH | run 83 | 12:15 restarted measurement with target
- Run 83
same settings as for runs 76, 77 |
8x |
|
749
|
Mon Jun 16 10:46:11 2025 |
CB JM JG AK | Run82 | Background without beam while source is
optimised. |
|
|
748
|
Mon Jun 16 08:17:41 2025 |
JG | D2 consumption | The current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar. |
|
|
747
|
Sun Jun 15 10:46:35 2025 |
EW, EM, AR, AB, CB, JG, AK | Run 81 | 11:45 New run started - run 81, same settings
as previous runs (75, 76 etc)
ROOT histograms NOT zeroed |
30x |
|
746
|
Sun Jun 15 07:01:37 2025 |
EW, EM | Run 80 | 08:00 New run started - run 80
Run whilst they are optimising
the beam after losing it, everything else |
    |
|
745
|
Fri Jun 13 19:41:32 2025 |
JG, SHB, JM, AR, EW, OF | Run 77, 78, 79 | New run started - Run 77 after refilling
LN2 dewar
Same settings as Run 75 & 76 |
17x |
|
744
|
Fri Jun 13 16:39:18 2025 |
JG, SHB | Run 76 | Same settings as run 75.
Detector 4 is biased at 100V and
switched from MEC to LEC. |
7x |
|
743
|
Fri Jun 13 14:45:58 2025 |
JG, SS, JM, CB, EW, AR | Run 75 |
90 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
 |
|
742
|
Thu Jun 12 15:33:17 2025 |
CB, JM, EM, JG, TD, AB, CF, AR | Run 74 | 16:34
Like Run 73, but particle detector
in YR10 now active, and recorded in MBS. |
27x |
|
741
|
Thu Jun 12 14:22:27 2025 |
JM, CB, TD, CF, JG, EM | Run 73 | 15:00
Cave closed, waiting for beam to
come back. |
   |
|
740
|
Thu Jun 12 14:08:42 2025 |
JM, CB | Run 72 - pulser walkthrough | Pulser walkthrough conducted while the
cave was open.
Pulser amplitudes 90000, 80000, |
|
|
739
|
Thu Jun 12 06:20:50 2025 |
JM | Run 68,69 - background | 07:20
Started a background run while
the cave is open. |
 |
|
738
|
Wed Jun 11 10:13:42 2025 |
EW, CB, PJW, AR, JM | Run 67 | As run 66, optimisation of beam completed
DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC |
14x |
|
737
|
Wed Jun 11 09:16:55 2025 |
CB | ASIC Control Settings | 11 June 10:18
2025Apr08-13.45.30 settings
DSSD4 not working as of the screenshots |
17x |
|
736
|
Wed Jun 11 08:37:48 2025 |
CB, PJW | Run 66 | 09:38
As Run 65, no changes, CRYRING
operators attempting to improve beam intensity. |
 |
|
735
|
Tue Jun 10 22:38:59 2025 |
JM, CB, PJW | Run 65 | 23:40
Offline anlaysis shows two clear
peaks for DSSD1 and 2 at very low energies |
7x |
|
734
|
Tue Jun 10 16:46:39 2025 |
JM, CB, EW, AY, PC | 150 keV - Run64 | Run 64 started.
150 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
42x |
|
733
|
Tue Jun 10 13:29:23 2025 |
EW, CB, JM | Thresholds changed | Experimented with slow comparator thresholds
as we go down to lower beam energies
Checked deadlayer loses with SRIM, |
   |
|
732
|
Tue Jun 10 09:57:50 2025 |
CB, JM, PJW, YuL, JG | Run 62 | 10:58
As Run 61, no target for background.
200 keV/A |
|
|
731
|
Tue Jun 10 09:44:33 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)
This means, no detector and target |
|
|
730
|
Tue Jun 10 09:44:30 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
|
|
729
|
Tue Jun 10 09:44:20 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
|
|
728
|
Sun Jun 8 11:55:00 2025 |
EM, PC, JM, CB, EW, AY, CB, PJW, YuL | Run 58,59,60, 61 | 12:52
Started Run 58 - Beam energy
200 keV/u. |
50x |
|
727
|
Sun Jun 8 10:05:30 2025 |
EM, PC, JM | Run57 | 11:06
Run during beam change. We will
go down to 200 keV/u |
|
|
726
|
Sun Jun 8 09:07:22 2025 |
EM, PC, JM | Run56 | NOTE: RunR55 is missing
Run56: Background run with 250
keV/u. Target off using the usual procedure. |
 |
|
725
|
Sat Jun 7 10:23:26 2025 |
JM, CB | carme-gsi rebooted | 10:00
The computer screen controlling
the DAQ on carme-gsi appeared to have crashed. |
|
|
724
|
Sat Jun 7 10:06:27 2025 |
JM, EM, CB, DB, AY, PC, CB | Run 54 | 11:10
We have started a new run at the
same energy as R53 (250 keV/u) due to an |
50x |
|
723
|
Fri Jun 6 17:27:03 2025 |
AY, ST, JM, EM, DB | Run 53 | Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2. |
11x |
|
722
|
Fri Jun 6 16:49:59 2025 |
CB, AY, ST | Beam overlap results for 200keV and 250keV | For 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal |
|
|
721
|
Thu Jun 5 16:54:18 2025 |
EW, ST, CB | Run 52 - 0.3 MeV/A | Run 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2
D+ beam deuterium target. D+ beam |
14x |
|
720
|
Thu Jun 5 08:50:00 2025 |
JM, CF, CB, EW | Run 51 - background | 09:49
DSSD4 has been biased to 100V in
steps of 5V from 60V. It was previously stable |
  |
|
719
|
Wed Jun 4 10:44:36 2025 |
EW, CB, JM, OF, JG, ST | Run 50 - 0.35 MeV/A | 11:30
Run 50 started.
D+ beam deuterium target. D+ beam |
13x |
|
718
|
Wed Jun 4 00:10:39 2025 |
JM | Run 49 - beam only | 01:10
Gas target turned off via the shutter
valve. |
6x |
|
717
|
Tue Jun 3 14:54:29 2025 |
PMH, ST | Run 48 | Run 48 started. Everything is running again.
We started at 3E13 at/cm2
D+ beam deuterium target. D+ beam |
6x |
|
716
|
Tue Jun 3 11:16:07 2025 |
EW, EM, JM | Run 47, beam only background | Run 47 started. Target cooling down after
water cooler failure, beam only background
D+ beam deuterium target. D+ beam |
 |
|
715
|
Mon Jun 2 20:03:43 2025 |
JG, AG, CB, EW, EM | Run 45/46, 0.5 MeV/A | Run 45 started.
D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation |
13x |
|
714
|
Mon Jun 2 17:48:07 2025 |
JG, AG | Run 44 scraper tests | Same settings are Run 43 but with coasting
beam and scrapers set to: 30 / - 30
mm. |
 |
|
713
|
Mon Jun 2 17:25:31 2025 |
JG, AG | Run 43 scraper tests | Same settings are Run 42 but bunched beam
and scrapers set to: 30 / - 30 mm.
|
|
|
712
|
Mon Jun 2 16:35:35 2025 |
EW, AG | Run 42 and scraper tests | 17:00
Scraper tests conducted. We tried
moving in the scrapers both at a fixed position |
 |
|
711
|
Mon Jun 2 09:30:38 2025 |
JM, EW, ST | Run 41 | Run 41 started.
D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation |
6x |
|
710
|
Sun Jun 1 15:33:50 2025 |
EW, JM, CB | Run 40 | 16:30
Run 40 started.
D+ beam deuterium target. D+ beam |
10x |
|
709
|
Sun Jun 1 07:46:34 2025 |
JM, EM, CB | Run 39 | 08:45
Run 39 started.
D+ beam deuterium target. D+ beam |
7x |
|
708
|
Sat May 31 10:46:42 2025 |
TD | Run 38 - remote monitoring |
11.40 DAQ continues
File G22-205/R38
|
21x |
|
707
|
Sat May 31 09:58:21 2025 |
JM | Run 38 | 10:56
Run 38 started.
D+ beam deuterium target. D+ beam |
10x |
|
706
|
Fri May 30 21:49:08 2025 |
JM, NP, CB | Run 37 | 22:49
Run 37 started.
D+ beam deuterium target. D+ beam |
  |
|
705
|
Fri May 30 20:47:47 2025 |
JM, CB, NP | Run 36 | 21:47
Run 36 started.
D+ beam deuterium target. D+ beam |
 |
|
704
|
Fri May 30 20:06:48 2025 |
JM, CB, NP | Run35 | 21:00
Run 35 started.
D+ beam deuterium target. D+ beam |
8x |
|
703
|
Fri May 30 07:27:41 2025 |
CB LB JM NP EM | Waiting for deuterium | 08:27
No run going.
Temperatures OK - attach |
8x |
|