AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 23     Entry time: Tue Mar 6 15:55:04 2018
Author: Thomas Chillery, Raffaele Buompane 
Subject: End of February 2018 Shifts 

On 23/02/2018:

At the end of the February 2018 shifts the detectors bias settings were:

S2 bias = -130.3V, leak I = 2.42uA

Pin diode bias = -70.1V, leak I = 0.00uA.

Both detectors were switched off, the preamp power was also switched off.

At 18:22 the chamber pressures read:

TPU1 = 2.3e-6 mBar

TPU2 = 6.9e-7 mBar

TPD1 = 1.6e-6 mBar

TPD2 = 1.7e-6 mBar

CHUP = 5.7e-6 mBar

CHDW = 1.5e-5 mBar

 

We closed the manual gate valve and T1600 Backing Valves. We switched off the turbos and roughing pumps Ecodry 1 and 2.

The nim bin for the quad bias and other nim modules was switched off. The Lecroy 1434A CAMAC Crate was switched off. The RAL shaping amp crate was switched off.

We put away the S2 and pin diode detectors.

The alpha source was removed from the target ladder.

The target ladder was remounted in the following configuration:

Position Target
1 Blank 3mm
2

No Target

3 CH2 VII
4 CH2 III
5 CH2 IV
6 No Target
7 No Target

We performed a general tidy-up around the chamber and workspaces we used during the past 9 days.

I took the PB-5 Pulse Generator and three 64 Way - 2X32 Way ribbon cables (for minor modification) back to Edinburgh.

I also took the mylar we discovered in the beamline on Tuesday 20th as a keepsake/ reminder anything can happen

At ~20:00 we declared victory for the week.

ELOG V3.1.4-unknown