AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CIRCE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 13 13:59:18 2018
Author
*
:
Subject
*
:
<p>Date: 07/04/2018</p> <p>At 12:10 we started the DAQ for 5.0 MeV 7Li in 2+ charge state bombarding CH2 Target III</p> <ul> <li>Save name: RData_1/180407111531</li> <li>DT = 0%</li> <li>Trigger rate ~ 30 Hz</li> <li>Event mult = 77.5</li> </ul> <p>At 12:31 we briefly stopped the beam to check the beam current, FC - 4 = 200 pA</p> <p>At 13:30 we stopped data aquisition, # good events = 735088. See attached for example spectra of the Central S2 front and back strips, downstream S2 front strips, and the diode monitor.</p> <p>At 13:32 the pressures read:</p> <ul> <li>TPU1 = 2.1e-6 mBar</li> <li>TPU2 = 9.0e-7 mBar</li> <li>TPD1 = 1.4e-6 mBar</li> <li>TPD2 = 1.7e-6 mBar</li> <li>CHUP = 1.1e-5 mBar</li> <li>CHDW = 1.3e-5 mBar</li> </ul> <p>The detectors status:</p> <ul> <li>Central S2 bias = -129.9V, leak I = 17.90uA</li> <li>diode bias = -70.1V, leak I = 0.00uA</li> <li>Downstream bias = -130.0V, leak I = 2.59uA</li> </ul>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
180407_7Li_5MeV_CentralS2_FrontStrip.png
Original size: 799x524
Attachment 2:
180407_7Li_5MeV_DWS2_FrontStrip.png
Original size: 799x524
Attachment 3:
180407_7Li_5MeV_CentralS2_BackStrip.png
Original size: 799x524
Attachment 4:
180407_7Li_5MeV_Diode.png
Original size: 799x524
Attachment 5:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown