AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CIRCE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 13 14:42:31 2018
Author
*
:
Subject
*
:
<p>Date: 07/04/2018</p> <p>To run the measurement we:</p> <ul> <li>Opened the central iris (actuator setting = 14.0mm)</li> <li>Opened the downstream iris (actuator setting = 1.5mm)</li> <li>Set the target ladder to position IV (50.015mm)- CH2 Target III</li> </ul> <p>At 14:40 we started the DAQ for 5.0MeV 7Be in the 2+ charge state on CH2 Target III</p> <ul> <li>DT = 0%</li> <li>Trigger rate ~ 10Hz</li> <li>Event mult = 71.2</li> <li>Save name: 180407134535</li> </ul> <p>At 15:04 we stopped the DAQ</p> <ul> <li>The proton spectrum seems very thin</li> <li>Decided to change to fresh CH2 target IV</li> </ul> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown