AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CIRCE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 13 15:08:04 2018
Author
*
:
Subject
*
:
<p>Date: 07/04/2018</p> <p>Began dismounting detectors:</p> <ul> <li>All detectors powered off</li> <li>Closed line and quadrupole valves</li> <li>Preamp power off</li> <li>Stopped turbos</li> <li>Closed manual gate valve and T1600 Backing valve</li> <li>Stopped Ecodry 1 and 2 roughing pumps</li> <li>Switched off CAMAC and RAL electronic crates</li> <li>FC - 0 suppression voltage switched off (was set to -360V for beam measurements)</li> <li>Switched off both NIM crates</li> </ul> <p>After venting the chamber I dismounted both S2 detectors and the 12um mylar in front of each detector</p> <p>I also dismounted the diode from the chamber, but left the 0.9um mylar glued onto the 4mm diameter metal collimator</p> <p>I left the target ladder in the chamber</p> <p>I remounted the central and downstream lids onto the chamber, the diode mount with mylar was left mounted on the central lid</p> <p>We performed a general cleanup around the lab of the tools used during this shift</p> <p>At 19:30 we left the lab ^_^</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown