AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 55     Entry time: Mon Nov 26 17:13:45 2018
Author: Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella 
Subject: Preparing chamber for 4MeV 7Be 2+ beam 

On 24/11/2018:

At 8:35 the chamber pressures read (mBar):

  • TPU1 = 2.2
  • TPU2 = 2.2
  • TPD1 = 2.2
  • TPD2 = 2.0
  • CHUP = Sensor Off
  • CHDW = No Sensor

The chamber was vented and the CH2 XV target replaced with new ones.

See picture 1 for target ladder after dismounting - the beam spot from 7Li is clearly visible on CH2 XV.

The target ladder configuration is now:

Target # Target
1 Blank 3mm Aperture
2 Blank 10mm Aperture
3 CH2 XVI (840 +/- 40 ug/cm^2)
4 CH2 XVIII (820 +/- 40 ug/cm^2)
5 natC III (590 ug/cm^2)
6 CH2 XX (880 +/- 40 ug/cm^2)
7 CH2 XIX (890 +/- 40 ug/cm^2)

See picture 2 for the new configuration.

The target ladder was remounted and at 9:15 the chamber pumped down. The far S2 still has the 12um mylar protective foil.

By 9:30 the pressures read (mBar):

  • TPU1 = 4.6e-5
  • TPU2 = 7.4e-6
  • TPD1 = 6.8e-6
  • TPD2 = 8.7e-6
  • CHUP = Sensor Off
  • CHDW = No Sensor

The Far S2 was biased to -130V, leak I = 1.38 uA. The diode biased to -70V, leak I = 0.00uA

A beam of 7Li 2+ 4.0MeV was focused onto the target position.

After focussing, FC4 = 260 pA, FCA = 250 pA. Both of these faraday cups are before the target chamber.

After focussing with the 10mm aperture, FCC = 195 pA. Focussing with the 3mm aperture, FCC = 190 pA. Faraday cup C (FCC) is after the target chamber.

A spectrum was collected for 7Li 4.0MeV

Run # 181124101041

  • Run time: 717s
  • Pulser ON, 25 Hz, as before
  • Target: CH2 XVI
  • Beam: 4.0 MeV 7Li 2+
  • Trigger rate: 3285/s
  • DT ~ 6%
Attachment 1: IMG_3231.JPG  2.068 MB  Uploaded Mon Dec 3 11:05:00 2018  | Hide | Hide all
IMG_3231.JPG
Attachment 2: IMG_3232.JPG  2.026 MB  Uploaded Mon Dec 3 11:06:31 2018  | Hide | Hide all
IMG_3232.JPG
ELOG V3.1.4-unknown