AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 6     Entry time: Fri Feb 16 18:21:17 2018
Author: Thomas Chillery 
Subject: Iris arm problems  

After lunch we were still having problems with the aperture hook, see first attached image highlighting the arm is located in close proximity (but not touching) the vacuum feedthrough and ribbon cable.

Meanwhile in Edinburgh Peter Black designed and built an additional component of the hook to assist in connecting it between the actuator and iris arms, see second attached image.

I decided enough time had been spent on this so far and to go ahead with testing the chamber vacuum.

Attachment 1: IMG_2677.JPG  1.816 MB  | Hide | Hide all
IMG_2677.JPG
Attachment 2: ApertureArm_PetersSolution.jpg  215 kB  | Hide | Hide all
ApertureArm_PetersSolution.jpg
ELOG V3.1.4-unknown