AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 62     Entry time: Mon Dec 3 16:39:42 2018
Author: Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane 
Subject: 3.0MeV 7Be on CH2 XIX 

On 26/11/2018:

Tuned beam for 3.0MeV 7Be 2+. Far S2 iris was closed during tuning.

After tuning, using 10mm aperture FCC = 5pA, using 3mm aperture FCC = 4pA.

Set ladder to position #7 - CH2 XIX

Run # 181126190248

  • Run time: 1298s
  • Pulser ON, as before
  • Target: CH2 XIX
  • Beam: 3.0MeV 7Be 2+

Left beam running and data collecting overnight

Run # 181126192446

  • Run time: 47915s
  • Pulser ON, as before
  • Target: CH2 XIX
  • Beam: 3.0MeV 7Be 2+
  • See attached picture 1 for sample S2 front strip spectrum. See attached picture 2 for diode spectrum.
Attachment 1: 181126192446_ADC1_Ch9.png  32 kB  | Hide | Hide all
181126192446_ADC1_Ch9.png
Attachment 2: 181126192446_ADC3_Ch16.png  32 kB  | Hide | Hide all
181126192446_ADC3_Ch16.png
ELOG V3.1.4-unknown