On 26/11/2018:
Tuned beam for 3.0MeV 7Be 2+. Far S2 iris was closed during tuning.
After tuning, using 10mm aperture FCC = 5pA, using 3mm aperture FCC = 4pA.
Set ladder to position #7 - CH2 XIX
Run # 181126190248
- Run time: 1298s
- Pulser ON, as before
- Target: CH2 XIX
- Beam: 3.0MeV 7Be 2+
Left beam running and data collecting overnight
Run # 181126192446
- Run time: 47915s
- Pulser ON, as before
- Target: CH2 XIX
- Beam: 3.0MeV 7Be 2+
- See attached picture 1 for sample S2 front strip spectrum. See attached picture 2 for diode spectrum.
|