<p>On 28/11/2018:</p>
<p>After pulser walkthrough (see eLog entry #67)</p>
<p>Dismounted targets from ladder - see picture 1 and 2 for upstream and downstream sides respectively</p>
<p>Mounted alpha source on ladder - see pictures 3 and 4 for upstream and downstream sides respectively</p>
<p>New target ladder configuration is now:</p>
<table border="1" cellpadding="1" cellspacing="1" style="width:500px">
<tbody>
<tr>
<td>Target Position</td>
<td>Target</td>
</tr>
<tr>
<td>1</td>
<td>Blank 3mm</td>
</tr>
<tr>
<td>2</td>
<td>Blank 10mm</td>
</tr>
<tr>
<td>3</td>
<td>Nothing</td>
</tr>
<tr>
<td>4</td>
<td>Alpha-Source</td>
</tr>
<tr>
<td>5</td>
<td>Nothing</td>
</tr>
<tr>
<td>6</td>
<td>Nothing</td>
</tr>
<tr>
<td>7</td>
<td>Nothing</td>
</tr>
</tbody>
</table>
<p>Dismounted thin CH2 target 50 - it was still attached to the collimator.</p>
<p>Remounted far S2 with 0.9um mylar, remounted far iris arm.</p>
<p>In air, pressures (mBar):</p>
<ul>
<li>TPU1 > 1000</li>
<li>TPU2 > 1000</li>
<li>TPD1 = 170 (above range)</li>
<li>TPD2 = 73 (above range)</li>
<li>CHUP = Sensor Off</li>
<li>CHDW = No Sensor</li>
</ul>
<p>Far S2 biased to -130.0V, leak I = 1.55uA. Diode biased to -70.1V, leak I = 0.01uA.</p>
<p>Ratemeter ~9200Hz.</p>
<p>Switched off detectors.</p>
<p>12:05 Ecodry 1 and 2 on. Started opening manual valve.</p>
<p>12:20 Manual valve opened fully, T1600 backing valve opened. Started turbos.</p>
<p>12:30 Pressures (mBar):</p>
<ul>
<li>TPU1 = 3.0e-5</li>
<li>TPU2 = 5.1e-6</li>
<li>TPD1 = 5.1e-6</li>
<li>TPD2 = 7.5e-6</li>
<li>CHUP = Sensor Off</li>
<li>CHDW = No Sensor</li>
</ul>
<p>Far S2 biased to -130.0V, leak I = 1.52uA. Diode biased to -70.1V, leak I = 0.01uA.</p>
<p>Rate meter ~ 7000Hz. Ladder set to position #4 - alpha source. Rate meter still ~ 7000Hz.</p>
<p>Run # 181128123940</p>
<ul>
<li>Run time: 3428s</li>
<li>Pulser ON, as before</li>
<li>Alpha-source</li>
<li>S2 mylar: 0.9um</li>
<li>DT ~ 22%</li>
<li>See attached picture 5 for sample Far S2 front strip spectrum</li>
</ul> |