On 29/11/2018:
Dismounted S2 2323-18 (496um), 12um mylar, diode, and diodes 0.9um mylar.
Performed general cleanup of lab. Boxed away cables and other parts. See attached pictures 1, 2, 3, and 4.
See attached picture 5, 6, 7, and 8 for status of electronics and target chamber at end of beamtime.
|