AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE  ELOG logo
Message ID: 72     Entry time: Mon Dec 3 18:55:31 2018
Author: Thomas Chillery, Raffaele Buompane 
Subject: End of beamtime - Cleanup 

On 29/11/2018:

Dismounted S2 2323-18 (496um), 12um mylar, diode, and diodes 0.9um mylar.

Performed general cleanup of lab. Boxed away cables and other parts. See attached pictures 1, 2, 3, and 4.

See attached picture 5, 6, 7, and 8 for status of electronics and target chamber at end of beamtime.
 

Attachment 1: IMG_3381.JPG  2.719 MB  | Hide | Hide all
IMG_3381.JPG
Attachment 2: IMG_3385.JPG  2.417 MB  | Hide | Hide all
IMG_3385.JPG
Attachment 3: IMG_3383.JPG  2.211 MB  | Hide | Hide all
IMG_3383.JPG
Attachment 4: IMG_3384.JPG  2.412 MB  | Hide | Hide all
IMG_3384.JPG
Attachment 5: IMG_3386.JPG  3.268 MB  | Hide | Hide all
IMG_3386.JPG
Attachment 6: IMG_3387.JPG  3.237 MB  | Hide | Hide all
IMG_3387.JPG
Attachment 7: IMG_3388.JPG  2.849 MB  | Hide | Hide all
IMG_3388.JPG
Attachment 8: IMG_3389.JPG  2.792 MB  | Hide | Hide all
IMG_3389.JPG
ELOG V3.1.4-unknown