AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DCF  ELOG logo
Message ID: 9     Entry time: Mon Feb 19 18:26:23 2024
Author: RSS MA TD PB  
Subject: Mounting at DCF 

Computer was attached to the network. Both flanges were mounted to check the fit, and everything was fine. Cooling hoses were connected and water cooling was checked by turning on the chiller, with no leak. On the actuator flange, two Al targets were mounted on the top and the middle position of the ladder and Quartz crystal will be mounted on the bottom position tomorrow.

Attachment 1: F31EFF91-7B90-48B3-97CF-74BEE94402F4.jpeg  280 kB  | Hide | Hide all
F31EFF91-7B90-48B3-97CF-74BEE94402F4.jpeg
Attachment 2: 341F8791-F881-4260-95B5-5B5E51FDDEB1.jpeg  241 kB  | Hide | Hide all
341F8791-F881-4260-95B5-5B5E51FDDEB1.jpeg
Attachment 3: 9DC1122F-7DA8-4B27-9670-C62F5D66D7AE.jpeg  264 kB  | Hide | Hide all
9DC1122F-7DA8-4B27-9670-C62F5D66D7AE.jpeg
Attachment 4: 0F6AF433-2AFD-4953-9E3E-0859862D29E5.jpeg  253 kB  | Hide | Hide all
0F6AF433-2AFD-4953-9E3E-0859862D29E5.jpeg
Attachment 5: 9C59EC2B-8BA6-48A8-8C33-0BD49074EA80.jpeg  257 kB  | Hide | Hide all
9C59EC2B-8BA6-48A8-8C33-0BD49074EA80.jpeg
Attachment 6: 0639A740-544C-42B2-BD9D-6908BB93B7CA.jpeg  271 kB  | Hide | Hide all
0639A740-544C-42B2-BD9D-6908BB93B7CA.jpeg
Attachment 7: 9817E4C5-0FA9-4AF2-9A43-0D7A5F208198.jpeg  242 kB  | Hide | Hide all
9817E4C5-0FA9-4AF2-9A43-0D7A5F208198.jpeg
Attachment 8: F0D019C7-B1E4-4910-8CF0-1E3B7EDEE282.jpeg  286 kB  Uploaded Mon Feb 19 21:31:42 2024  | Hide | Hide all
F0D019C7-B1E4-4910-8CF0-1E3B7EDEE282.jpeg
Attachment 9: 5797BCF8-85F6-4AC9-A8BB-762E7468B7C2.jpeg  211 kB  Uploaded Mon Feb 19 21:32:14 2024  | Hide | Hide all
5797BCF8-85F6-4AC9-A8BB-762E7468B7C2.jpeg
Attachment 10: E41C813D-E887-435F-85BE-1F918ED17242.jpeg  313 kB  Uploaded Mon Feb 19 21:32:43 2024  | Hide | Hide all
E41C813D-E887-435F-85BE-1F918ED17242.jpeg
ELOG V3.1.4-unknown