AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Dec 18 02:44:27 2019
Author
*
:
Subject
*
:
Beam: 238U (850 MeV/u) Fragment: 168Re Tuning accelerator and FRS, believed since 3AM we are implanting on AIDA. FEE issues: One HEC in aida03 seems to be empty - LEC channel fills aida09 has a lot of weird channels, check/load doesn't seem to fix aida10 still no data after cable replaced DSSD leakages OK - slightly higher now Temps good Fig 4: Rates 14:32 Leakages and temps good AS Before Checking if we are implanting properly - possibly into the first DSSD at the moment Fig 5 FRS PID Fig 6 DSSD Fig 7 DSSD (PID gated)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
1812-stats.png
Original size: 1916x775
Attachment 2:
1812-leakages.png
Original size: 502x344
Attachment 3:
1812-temps.png
Original size: 1412x420
Attachment 4:
1812v2-Rates.png
Original size: 1916x777
Attachment 5:
nh_1712_zaoq.png
Original size: 1054x1011
Attachment 6:
nh_1712_dssd.png
Original size: 1054x1011
Attachment 7:
nh_1712_dssd_id.png
Original size: 1054x1011
Attachment 8:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown