AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 119     Entry time: Fri Dec 20 12:04:03 2019
Author: NH, TD 
Subject: Friday 20 December 2019 
Fig 1: DSSD Leakage currents ok

Fig 2: FEE Temps ok

Fig 3: aida08 has a few timestamp errors in merger

Fig 4, 5: GSI WR OK

Fig 6: All System wide checks passed 

FIg 7: Stats good

13:11 - Alpha Run Stopped, Final File: R9_6

FEEs powered off, DSSD bias off.
Attachment 1: Screenshot-CAEN_HV_Control.png  11 kB  | Hide | Hide all
Screenshot-CAEN_HV_Control.png
Attachment 2: FeeTemps.png  97 kB  | Hide | Hide all
FeeTemps.png
Attachment 3: mergerTSerrors.png  74 kB  | Hide | Hide all
mergerTSerrors.png
Attachment 4: gsiwr1.png  88 kB  | Hide | Hide all
gsiwr1.png
Attachment 5: gsiwr2.png  111 kB  | Hide | Hide all
gsiwr2.png
Attachment 6: checks.png  123 kB  | Hide | Hide all
checks.png
Attachment 7: stats.png  85 kB  | Hide | Hide all
stats.png
ELOG V3.1.4-unknown