AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 125     Entry time: Fri Feb 14 12:50:29 2020
Author: NH 
Subject: AIDA Noise 14.02.2020 
Electricians changed the grounding for the DESPEC platform to a large pillar that goes deep into soil

Change in grounding was apparently successful at reducing the noise complaints in Cave C (R3B)

AIDA:

Fig 1 & 2: Waveforms (Odd/Even)
Fig 3 & 4: Waveforms Zoomed
Fig 5: Good Event Rate
Fig 6: Merger Rate: 2 M items/sec
Fig 7: HV supply (no change)

There does seem to be a modest improvement (Merger rate down from 3 million, good event rates seem *better*)
(Reminder: AIDA@GSI sends 3 items per each ADC event, so merger rate is higher)
Not sure if this is still where it should stand?
Attachment 1: wavesOdd.png  158 kB  | Hide | Hide all
wavesOdd.png
Attachment 2: wavesEven.png  138 kB  | Hide | Hide all
wavesEven.png
Attachment 3: wavesOddZ.png  175 kB  | Hide | Hide all
wavesOddZ.png
Attachment 4: stats_goodevents.png  83 kB  | Hide | Hide all
stats_goodevents.png
Attachment 5: mergerstats.png  96 kB  | Hide | Hide all
mergerstats.png
Attachment 6: hv.png  11 kB  | Hide | Hide all
hv.png
ELOG V3.1.4-unknown