AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:37:56 2025
Author
*
:
Subject
*
:
c 09.00 aida03 drops Histogram enable at DAQ GO NH determined this was due to Options DB corruption and fixed 09.55 DAQ currently running No Storage mode ASIC settings 2019Oct31-13.24.23 (different from the December ones yesterday which experienced corruption) slow comparator 0xa BNC PB-5 pulser amplitude 1.0V , attenuator x1 frequency 2Hz decay time 1ms DSSSD biases & leakage currents OK - attachment 1 FEE64 temps OK - attachment 2 good events statistics OK - attachment 3 system wide checks - attachments 4-11 aida06, 08, 10, 12 re-calibrated OK, all others OK aida03 failed WR decoder status - collect all WR errors for baseline - all FEE64s pass WR decoder status sync all ASIC clocks using ReSync merger & TapeServer OK - attachments 12-14 13.29 DAQ to disk file S480/R6 ASIC settings 2019Oct31-13.24.23 slow comparator 0xa aida01 LEC/MEC fast comparator 0x64, all other FEE64s 0xff 14.57 fast comparator thresholds LEC/MEC changed to 0xff for all FEEs 15.01 FEE temperatures normal, aida1 virtex temperature still slightly over 65 degrees (attachment 15) leakage currents recorded to spreadsheet (attachment 16) good events rate similar to previous, high in DSSD3 and seems to be returning to normal in DSSD1 except in one FEE (attachments 17 and 18) system wide checks OK data rate around 22000 KB per second (attachment 19) as of 15.12 on file R6_80 attachment 20 is total event stats shows events are being implanted attachment 21 and 22 show low energy spectrum left most peak is pulser and rightmost is central noise. middle peak in aida1 attachment 23 and 24 show high energy spectrum, aida4 histogram not being produced unsure why. attachment 25 and 26 show waveforms, only aida3 histogram working 16.00 checked ASIC control, all OK 16.35 spill is now changed to 10s with beam intensity increase by factor of 10. 3000 implants per spill. 16.42 leakage currents recorded to spreadsheet 17.10 system wide checks ok fee64 temperatures ok - attachment 27 detector bias/leakage currents ok - attachment 28 good event statistics ok - attachment 29 17.15 moved slit at S2 - rate drop to try remove some 96Pd 17.20 writing to file R6_166 17.44 merger/tapeserver ok. Data rate ~ 25000 kb/s 18:10 Fine tuning implantation profile Removing 0.25mm Al degrader (60 mg/cm^2) to get 96Pd slightly further in to AIDA. DESPEC is closing the current file, R6_203 was just finished on AIDA on typing this. (Maybe the end of run S480f004_ on DESPEC side but that elog was not updated since 16:40?) Decision based on assumption of 6 GeV 96Pd having a range 1 mm in silicon. 19.16 system wide checks ok good event statistics ok - attachment 30 detector bias/leakage currents ok - attachment 31 fee64 temperatures ok - attachment 32 19.39 TapeServer/Merger ok. Writing to file R6_265. Data rate ~ 25000 kb/s 20.07 1.8.H high energy spectra front and back side (attachments 33 + 34) 20.36 S4 timing change, increased by factor of 2 20.38 Merger/TapeServer ok. Data being forwarded to MBS. 20.38 writing to file R6_308 at rate of ~ 25000 kb/s 21:21 system wide checks ok good event statistics ok - attachment 35 fee64 temperatures ok - attachment 36 detector bias/leakage currents ok - attachment 37 21:57 TapeServer/merger ok data forwarding to MBS ok writing to file R6_368 at rate of ~26000 kb/s 23:10 system wide checks ok good event statistics ok - attachment 38 fee64 temperatures ok - attachment 39 detector bias/leakage currents ok - attachment 40 23:24 TapeServer/merger ok data forwarding to MBS ok writing to file R6_435 at rate of 27000 kb/s 23:42 rate spectra - attachment 41
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown