AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:29:09 2025
Author
*
:
Subject
*
:
> ASIC settings 2019Oct31-13.24.23 > slow comparator 0xa > > BNC PB-5 pulser > amplitude 1.0V , attenuator x1 > frequency 2Hz > decay time 1ms > > 00:44 Implantation range in AIDA - attachment 1 > > 01:14 At current rate will run out of space in 35 hours ~ 18:00 hours on Friday 13th March. > During the day if possible it might be wise to try and obtain a USB3 HDD mount to mount one of the spare drives in > the AIDA boxes and begin moving files onto that > > 01:35 System wide checks all ok > Bias and leakage current ok - attachment 2 > Stats all ok - attachment 3 > FEE temperatures ok - attachment 4 > > TapeServer rate around 25-29MB per second > Merger rate around 2.6-3.2 million items per second > > 04:11 System wide checks all ok > Bias and leakage currents ok - attachment 5 > Stats all ok - attachment 6 > FEE temp ok - attachment 7 > 06:38 System wide checks all ok > Bias and leakage currents ok - attachment 8 > Stats all ok - attachment 9 > FEE temp ok - attachment 10
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown