AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:38:01 2025
Author
*
:
Subject
*
:
ASIC settings 2019Oct31-13.24.23 slow comparator 0xa BNC PB-5 pulser amplitude 1.0V , attenuator x1 frequency 2Hz decay time 1ms 09:00 Bias and leakage currents ok - attachment 1 Statistics ok - attachment 2 FEE temperatures ok - attachment 3 System wide checks all ok 09:08 No beam, not sure exactly how long it has been down. FRS team are working on it 09:28 still no beam. issues with SIS. DAQ set to NoStorage mode most recent file R7_522 10.27 beam is back writing to file R9_0 10.43 attachment 4 - hit rate spectra 11:09 all system wide checks ok FEE64 temps ok - attachment 5 good event statistics ok - attachment 6 detector bias and leakage currents - attachment 7 11.18 merger ok, ~ 2.7 million data items per second TapeServer ok, ~ 25 Mb/s data rate Data forwarding to MBS ok 11.20 writing to file R9_39 11.22 beam off 11.24 beam back online (R9_42) 11.41 FRS has reverted to an older setting 13:04 hit rate spectra - attachment 8 13:19 all system wide checks ok 13:30 FEE64 temps ok - attachment 9 good event statistics ok - attachment 10 detector bias and leakage currents ok - attachment 11 15:31 good event statistics ok - attachment 13 detector bias and leakage currents ok - attachment 14 FEE64 temps ok - attachment 15 all system wide checks ok beam seems to have stopped during 2pm meeting 15.35 TapeServer ok, data rate ~ 23 Mb/s Merger ok, rate of 2.5 - 3 million data items per second data forwarding to MBS ok 15.38 AIDA writing to file R9_233 16:02 beam back - AIDA writing to file R9_250
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown