AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:37:53 2025
Author
*
:
Subject
*
:
ASIC settings 2019Oct31-13.24.23 slow comparator 0xa BNC PB-5 pulser amplitude 1.0V , attenuator x1 frequency 2Hz decay time 1ms 16:51 Bias and leakage currents ok but starting to increase in DSSD 1 predominantly - attachment 1 Statistics ok - attachment 2 FEE temp ok - attachment 3 System wide checks all ok 16:57 Histograms zeroed 17:17 ASIC control check done 17:40 Layout 1 - attachment 4 Layouts 3 and 4 - attachments 4 and 5 Layouts 5 and 6 - attachments 6 and 7 19:06 Earlier in the shift two extra 8TB drives were formatted and mounted Named SecondDrive and ThirdDrive TapeData folder created on SecondDrive Plan is before the end of this shift to move the symbolic link from the filling up drive to the new drive Current prediction is drive would otherwise be full by 12:20 tomorrow. Playing it safe and switching early 21:57 Bias and leakage ok - attachment 8 Statistics ok - attachment 9 FEE Temps ok - attachment 10
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown