AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:28:39 2025
Author
*
:
Subject
*
:
> ASIC settings 2019Oct31-13.24.23 > slow comparator 0xa > > BNC PB-5 pulser > amplitude 1.0V , attenuator x1 > frequency 2Hz > decay time 1ms > > 16:51 Bias and leakage currents ok but starting to increase in DSSD 1 predominantly - attachment 1 > Statistics ok - attachment 2 > FEE temp ok - attachment 3 > System wide checks all ok > > 16:57 Histograms zeroed > > 17:17 ASIC control check done > > 17:40 Layout 1 - attachment 4 > Layouts 3 and 4 - attachments 4 and 5 > Layouts 5 and 6 - attachments 6 and 7 > > 19:06 Earlier in the shift two extra 8TB drives were formatted and mounted > Named SecondDrive and ThirdDrive > TapeData folder created on SecondDrive > Plan is before the end of this shift to move the symbolic link from the filling up drive to the new drive > Current prediction is drive would otherwise be full by 12:20 tomorrow. > Playing it safe and switching early > > 21:57 Bias and leakage ok - attachment 8 > Statistics ok - attachment 9 > FEE Temps ok - attachment 10
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown