AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:29:04 2025
Author
*
:
Subject
*
:
> ASIC settings 2019Oct31-13.24.23 > slow comparator 0xa > > BNC PB-5 pulser > amplitude 1.0V , attenuator x1 > frequency 2Hz > decay time 1ms > > 07:46 all system wide checks ok > > good event statistics ok - attachment 1 > > FEE64 temperatures ok - attachment 2 > > detector bias/leakage currents ok - attachment 3 > > 08:48 merger ok ~ 3 million data items/s > > TapeServer ok ~ 27 MB/s > > data forwarding to MBS ok > > 08:50 AIDA writing to file SecondDrive/TapeData/S480/R12_1524 > > 09:56 all system wide checks ok > > good event statistics ok - attachment 4 > > detector bias/leakage currents ok - attachment 5 > > FEE64 temperatures ok - attachment 6 > > 12:09 all system wide checks ok > > > 12:13 all system wide checks ok > > good event statistics ok - attachment 7 > > FEE64 temperatures ok - attachment 8 > > detector bias/leakage currents ok, but ramping up - attachment 9 > > > 13:32 merger ok ~ 3 million data items/s > > TapeServer ok ~ 23 MB/s > > data forwarding to MBS ok > > Beam seems to be off > > 13:33 AIDA writing to file R12_1743 > > *update* checked DESPEC S480 Elog, issues with UNILAC, beam lost at 13:29 > > 13:55 beam back > > 13:57 AIDA writing to file R12_1759 > > 14:35 all system wide checks ok > > FEE64 temperatures ok - attachment 10 > > good event statistics ok - attachment 11 > > detector bias/leakage currents ok, but ramping up - attachment 12 > > 15:18 merger ok ~ 2.7 million data items/s > > TapeServer ok ~ 27 MB/s > > data forwarding to MBS ok > > AIDA writing to file R12_1283 > > 16:00 1.8.H high energy spectra - attachments 13 & 14 > > hit-rate spectra - attachment 15 > > 16.22 all system wide checks okay > FEE temperatures okay (attachment 16) > leakage currents okay and recorded to spreadsheet (attachment 17) > good event stats okay (attachment 18) > merger running at 3M items/sec > tape service running at 26MB/sec > > 18.00 began compressing R7 files with command: nice -n 10 gzip -v R7_* & > > all system wide checks okay > FEE temperatures okay (attachment 19) > leakage currents okay and recorded to spreadsheet (attachment 20) > good event stats okay (attachment 21) > merger running at 3M items/sec > tape service running at 27MB/sec > > 20.10 all system wide checks okay > FEE temperatures okay (attachment 22) > leakage currents okay and recorded to spreadsheet, detectors 1 and 2 still rising (attachment 23) > good event stats okay (attachment 24) > merger running at 3M items/sec > tape service running at 25MB/sec > > rates histogram (attachment 25) > low energy histograms (attachment 26 and 27) > high energy histograms (attachments 28 and 29) > > > 22.07 all system wide checks okay > FEE temperatures okay (attachment 30) > leakage currents okay and recorded to spreadsheet (attachment 31) > good event stats okay (attachment 32) > merger running at 3M items/sec > tape service running at 25MB/sec > currently on R12_2097 > > 23.56 all system wide checks okay > FEE temperatures okay (attachment 33) > leakage currents okay and recorded to spreadsheet (attachment 34) > good event stats okay (attachment 35) > merger running at 3M items/sec > tape service running at 26MB/sec > > finishing up now. night shift group have been informed how to check up on AIDA, there is a sheet on the table with relevant information >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown