01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s. A new 7 port USB hub has also been placed for the last few serial connections. For the first experiment this year, we will run with a narrow AIDA configuration as in 2020. (12 FEEs) The system has been powered up and biased successfully. To be monitored over the next few days. A lot of the FEE serial monitors are missing, I think a hub has been disconnected from nnrpi1. This will be investigated on Wednesday. The rack will also be grounded properly on Wednesday to investigate the impact on the noise. A single new water line (feed and return) needs to be installed for the 16th FEE, this will be done once the hose is found/ordered... The 4 new FEE64s will be mounted and powered up at some point to obtain the MAC addresses, and possibly check MIDAS merging 16 FEE64s. Waveform data will be taken wednesday before & after grounding the rack to see noise situation currently
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown