AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 20:07:13 2025
Author
*
:
Subject
*
:
> 01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s. > A new 7 port USB hub has also been placed for the last few serial connections. > > For the first experiment this year, we will run with a narrow AIDA configuration as in 2020. (12 FEEs) > > The system has been powered up and biased successfully. To be monitored over the next few days. > > A lot of the FEE serial monitors are missing, I think a hub has been disconnected from nnrpi1. This will be investigated on Wednesday. > The rack will also be grounded properly on Wednesday to investigate the impact on the noise. > > A single new water line (feed and return) needs to be installed for the 16th FEE, this will be done once the hose is found/ordered... > > The 4 new FEE64s will be mounted and powered up at some point to obtain the MAC addresses, and possibly check MIDAS merging 16 FEE64s. > > Waveform data will be taken wednesday before & after grounding the rack to see noise situation currently
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown