AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:27:01 2025
Author
*
:
Subject
*
:
> 08:00 ASIC settings 2019Dec19-16.19.51 > DSSSD#1 slow comparator 0xa > DSSSD#2 slow comparator 0xa > DSSSD#3 slow comparator 0xd > > BNC PB-5 Pulser > Amplitude 1.0V > Attenuation x1 > Frequency 2Hz > tau_d 1ms > - polarity > Delay 250ns, tail pulse > > All system wide checks ok *except aida06 fails clock status 6* > Statistics - attachment 1 > FEE Temperatures - attachment 2 > Bias and leakage currents ok - attachment 3 > > 08:20 Merger ~4.5M data items/s > TapeServer ~ 45MB/s > > Writing to file R6_1148 > > 09:00 Beam off for optimisation - writing to file R6_1212 > > Expected back at 09:30 > > 09:30 Beam will be off for a bit longer - an hour or two > > 09:34 All system wide checks ok *except aida06 fails clock status 6* > Statistics - attachment 4 > FEE Temperatures - attachment 5 > Bias and leakage currents ok - attachment 6 > > Merger ~4.5M data items/s > TapeServer ~ 45MB/s > > 10:10 (NH) Stopped DAQ to try the new merger from VP, new run R7, R8 for these tests > Tape rate was 110 MB/s (!) and MBS relay seemed nothing... also it didn't stop when DAQ was stopped but took 10+ seconds > to finish > Something confusing, will look at data and report to VP > Reverted to original merger and back... 45 MB/s > R9 > > 12.00 (LS) > System wide checks okay except 'FEE64 module aida06 global clocks failed, 6' > Statistics (attachment7) > FEE temps (attatchment8) > Rate spectra (attachment9), beam still down > Leakage Currents written to sheets (attachment10) > Merger ~45M items/s > Tapeserver ~43MB/s > > 14.00 Still no beam but is expected to return soon > System wide checks okay except 'FEE64 module aida06 global clocks failed, 6' > Statistics (attachment11) > FEE temps (attatchment12) > Leakage Currents written to sheets (attachment13) > Merger ~45M items/s > Tapeserver ~44MB/s > > 14.40 Leakage currents still rising slowly compared to previous days, so will keep an eye on them (attachment14) > > 15.00 Beam is back (attachment15) > Still writing to R9 (roughly around R9_386) > > 15.28 No beam (attachment16) > > 15.41 Beam back (attachment17) > Roughly R9 (roughly around R9_439) > > 16.00 Analysis of R9_469, from FEE0 and FEE2 the hit rate for one side is around 48 HEC data items/second (attachment18) > > 16.20 System wide checks okay except 'FEE64 module aida06 global clocks failed, 6' > Statistics (attachment19) > Spectra Rate (attachment20) > FEE temps (attatchment21) > Leakage Currents written to sheets (attachment22), > still rising but looking on Grafana 7 day period should start to lower around 17.00 > Merger ~45M items/s > Tapeserver ~43MB/s > > 16.55 Beam down (attachment23), back a couple minutes later > > 15.51 beam down (attachment24) >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown