|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 183
Entry time: Tue Mar 9 06:58:14 2021
|
Author: |
CA, LS |
Subject: |
March 9th 08:00-11:00 shift |
|
|
08:00 DAQ continues ok - writing to file R13_120
Merger ok - 4.6M data items/s
TapeServer ok - 43 MB/s
08:03 - all system wide checks ok
- Temperatures ok - attachment 1
- good event statistics ok - attachment 2
- detector bias/leakage currents ok - attachment 3
08:08 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
DSSSD#3 slow comparator 0xd
BNC PB-5 Pulser
Amplitude1.0V
Attenuation x1
Frequency 2Hz
tau_d 1ms
- polarity
Delay 250ns, tail pulse
08:32 CA briefly lost network connection - back now
08:42 DESPEC on file 102
09:24 Rate spectra - attachment 4
09:32 HEC spectra - attachment 5/6
beam off - writing to file R13_243
09:42 merger bad timestamp errors - attachment 7
all system wide checks ok
10:30 NH - Beam was down, I try the new merger from Vic again (R14)
I made a mistake and had to powercycle fees as they got stuck! aida10 seemed to reboot itslef
After fixing my mistakes, all running with new merger and rate 15 MB/s (R14)
It all looked OK even going to MBS/Go4
I reverted back to original hot merger, R15 and look at the data.
Beam is now back and I return AIDA to shifters :)
11.30 System wide checks okay except ADC calibration:
FEE64 module aida07 failed
FEE64 module aida10 failed
Calibration test result: Passed 10, Failed 2
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun
calibration for that module
Reran calibration for both FEEs but still fail
Statistics (attachment8)
Rate spectra (attachment9)
FEE temps (attachment10)
Leakage currents written to sheet (attachment11)
Tapeserver ~33MB/s
Merger ~ 3.4M items/s
AIDA file R15_92
11.55 Beam off for a couple minutes but back now
12.00 New Merge terminal disappeared so stopped daq and restarted, and also restarted MBS back working
Now writing to R16
Merger ~ 4.5M items/s
Tapeserver ~44MB/s
12.41 no beam
13.00 DAQ crashed (aida03 no responding), AIDA recovered from power cycle while beam is down
Beam is back now, forwarding to MBS
Merger ~ 45M items/s
Tapeserver ~44MB/s
Writing to R17
13.20 System wide checks okay except ADC calibration:
FEE64 module aida07 failed
FEE64 module aida10 failed
Calibration test result: Passed 10, Failed 2
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun
calibration for that module
Statistics (attachment12)
Rate spectra (attachment13)
FEE temps (attachment14)
Leakage currents written to sheet (attachment15)
Tapeserver ~45MB/s
Merger ~ 4.4M items/s
14.27 beam off
file R17_115
back a couple minutes later
14.40 no beam again back at 14.46
15.40 System wide checks okay except ADC calibration:
FEE64 module aida07 failed
FEE64 module aida10 failed
Calibration test result: Passed 10, Failed 2
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun
calibration for that module
Statistics (attachment16)
Rate spectra (attachment17)
FEE temps (attachment18)
Leakage currents written to sheet (attachment19)
Tapeserver ~44MB/s
Merger ~ 4.4M items/s
15.52 beam down R17_221, back at 15.58 R17_229
16.07 Beam down
16:20 Removed S480 files from /media/1e... and /media/SecondDrive
Set merger to no output and stopped tapedata.
Changed symbolic link of /TapeData to /media/1e.....
Restarted tapedata and the merger with outputting to file R20
Local DESPEC was made aware of this before carrying out and stopped the run.
Beam back
17.12 beam down for a couple of minutes R20_90
17.40 System wide checks okay except ADC calibration:
FEE64 module aida07 failed
FEE64 module aida10 failed
Calibration test result: Passed 10, Failed 2
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun
calibration for that module
Statistics (attachment20)
Rate spectra (attachment21)
FEE temps (attachment22)
Leakage currents written to sheet (attachment23)
Tapeserver ~45MB/s
Merger ~ 4.5M items/s
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|