AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:38:00 2025
Author
*
:
Subject
*
:
<p>Took over from TD ... All is well.</p> <p>00:45 System Wide Checks</p> <p>Clock: 12 passed, 0 failed.</p> <p>ADC Calibration: Passed 12, 0 failed.</p> <p>White Rabbit Decoder: Passed 4,failed 8. - See screenshot.</p> <p>FPGA Passed 11, failed 1. - See screenshot.</p> <p>FEE64 Linux: See screenshot.</p> <p>-----</p> <p>02:49 run closed. Checking beam.</p> <p>03:00 File 55 opened.</p> <p>03:13:23 DAQ crashed due to AIDA02 rebooting. TD restarted DAQ. Ready at approx 04:00.</p> <p>File 56 opened at 4:24.</p> <p>---------</p> <p>04:30 System Wide Checks (See screenshots)</p> <p>White Rabbit Decoder: Passed 12, failed 0.</p> <p>FPGA: page not loading properly.</p> <p>----</p> <p>05:37 System wide checks. See screenshots</p> <p>Clock: Status: 11 passed. 1 fail.</p> <p>ADC calibration: Passed 9, failed 3.</p> <p>White Rabbit decoder: Passed 12, failed 0.</p> <p>-----</p> <p>07:32 System wide checks (See screenshots).</p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown