AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 29     Entry time: Thu Mar 21 14:10:10 2019
Author: NH 
Subject: FEE Temperatures 

All 12 FEEs powered up, and temperatures are OK.

Passed ASIC checks and system wide checks - now checking cabling and to mount snout.

Attachment 1: FEETemps.png  38 kB  | Hide | Hide all
FEETemps.png
ELOG V3.1.4-unknown