AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 31     Entry time: Fri Mar 22 13:32:55 2019
Author: NH 
Subject: AIDA Startup @ 22.03.2019 

FEEs have been on this morning, temperatures attached

Leakage current attached

the DSSD is attached to the following AIDA modules:
Beam Left: 10
Beam Right: 12
Bottom: 11
Top: 9

MIDAS Servers on, will be looking at resolution (pulser)

Attachment 1: 20190323Bias.png  19 kB  | Hide | Hide all
20190323Bias.png
Attachment 2: 20190322FEETemps.png  40 kB  | Hide | Hide all
20190322FEETemps.png
ELOG V3.1.4-unknown