AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Mar 22 14:31:24 2019
Author
*
:
Subject
*
:
<p>Extra FEE information:</p> <p>HV braid (0 V) goes into FEE10 (beam left) with LK1 jumper<br /> HV core (-160 V) goes into FEE09 (top)</p> <p>Could be related to noise in FEE09?<br /> Both these FEEs have higher rates too</p> <p>Other setup information:<br /> According to the switch in S4, the AIDA workstation is only connected via 100Mbps rather than 1Gbps. (Fig 1)</p> <p>Plastic is inside the snout, but is not yet connected to the electronics yet<br /> Figures 2-4 Show the DSSD & Plastic in the Snout. Plastic is far upstream solely to ensure plenty of ribbon cable</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20190322_132528s.jpg
Original size: 1008x756
Attachment 2:
20190319_131821s.jpg
Original size: 1008x756
Attachment 3:
20190313_161102s.jpg
Original size: 1008x756
Attachment 4:
20190313_155418s.jpg
Original size: 1008x756
Attachment 5:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown