AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 25 14:44:33 2019
Author
*
:
Subject
*
:
<p>Plastic electronics have now been installed.</p> <p>Water is not leaking still.</p> <p>FEE64s powered on at 15:00 to test MBS connection (fig1: temperatures)</p> <p>MBS relay connects to MBS server OK...</p> <p>AIDA Merger does not accept any data... (links with data reads 0) and lots of timestamp errors in log? (Figs 2-4)</p> <p><br /> Startup procedure incorrect?</p> <p>Otherwise things still OK.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Temps.png
Original size: 1275x325
Attachment 2:
AIDARUNv2.png
Original size: 1280x1024
Attachment 3:
Mergerv2.png
Original size: 1280x1024
Attachment 4:
Tapev2.png
Original size: 1280x1024
Attachment 5:
MergerConsolev2.png
Original size: 661x465
Attachment 6:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown