AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 374     Entry time: Mon Jul 5 14:36:15 2021
Author: NH 
Subject: Monday 5 July 
AIDA Unbiased and powered down
All FEEs were running before stoppage. None had rebooted.
Aida05 did not respond until merger was restarted, all other DAQs responded fine.

Snout removed from S4 and downstream bPlast removed from snout to go into Scanner setup
AIDA will remain in Snout in lab for time being.

FEEs will be reconnected soon to run in pulser-only mode if desired - but kept powered off for now
ELOG V3.1.4-unknown