AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 415     Entry time: Wed Apr 27 15:47:46 2022
Author: NH, HA, SA, CJ 
Subject: AIDA 27 Apr 22 
Remount snout in S4 (photos to come) 
Alignment with DEGAS OK but a bit short...  DEGAS platform will be brought 31 mm closer to AIDA by rail adjustment

Can mount bPlas booster boards on old ITEM frames and also partly on AIDA snout (isolated)

-

Reconnect all adapter boards and grounds, bias AIDA...

HV OK. We still have a light leak at the snout endcap. "Fixed" with sheet for now

HV leakage currents figure 1

Start AIDA DAQ and check rates.. all seem OK. aida07 is very noisy other p+n good
Notice some issues in aida04, check and ribbon cable slightly loose on one side of adapter
No change to other FEEs.
Aida07 was inspected but nothing obviously wrong

Rates figure 2
Rate spectra figure 3
Wavesform figures 4 (p+n), 5 (n+n)
Pulser peak withs
 p+n figure 6, width ~  70 channels (50 keV)
 n+n figure 7, width ~ 570 channels (400 keV)

n.b. double peak in aida14 is an artifact from an uncleared histogram

DSSDs debiased to allow work on bPlas cabling without tripping DSSDs
Attachment 1: 2022-04-27_16-42-37_HV.png  45 kB  Uploaded Wed Apr 27 20:17:19 2022  | Hide | Hide all
2022-04-27_16-42-37_HV.png
Attachment 2: 022-04-27_16-39-58_Rates.png  85 kB  Uploaded Wed Apr 27 20:18:37 2022  | Hide | Hide all
022-04-27_16-39-58_Rates.png
Attachment 3: 2022-04-27_16-40-23_RatesSpectra.png  237 kB  Uploaded Wed Apr 27 20:18:45 2022  | Hide | Hide all
2022-04-27_16-40-23_RatesSpectra.png
Attachment 4: 2022-04-27_16-41-46_pnwaves.png  225 kB  Uploaded Wed Apr 27 20:19:02 2022  | Hide | Hide all
2022-04-27_16-41-46_pnwaves.png
Attachment 5: 2022-04-27_16-42-20_nn_waves.png  182 kB  Uploaded Wed Apr 27 20:19:11 2022  | Hide | Hide all
2022-04-27_16-42-20_nn_waves.png
Attachment 6: 2022-04-27_16-43-30_pn_pulser_70ch.png  214 kB  Uploaded Wed Apr 27 20:19:56 2022  | Hide | Hide all
2022-04-27_16-43-30_pn_pulser_70ch.png
Attachment 7: 2022-04-27_16-44-18._nn_pulser_568ch.png  155 kB  Uploaded Wed Apr 27 20:20:31 2022  | Hide | Hide all
2022-04-27_16-44-18._nn_pulser_568ch.png
ELOG V3.1.4-unknown