AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:38:00 2025
Author
*
:
Subject
*
:
10:30 DAQ appears to have stopped Attachment 2 - DSSSD bias and leakage current OK Attachments 1, 3-5 - zero rate adc data items all FEE64s - note aida08 adc data item counter zero RESET/SETUP/GO aida08 *only* DAQ STOP *all* FEE64s Attachment 6 - FEE64 temperatures OK Attachments 7-23 - system wide checks - all OK 10:48 DAQ GO *all* FEE64s all spectra zero'd attachment 29 - ADC data items n+n FEE64s aida02, 4, 6 & 8 c. 250k p+n FEE64s aida07, 9 & 12 c. 100-150k, all other FEE64s < 100k attachments 26 & 27 1.8.L spectra aida01 peak width 112ch FWHM aida02 peak width 485 ch FWHM attachments 24 & 25 1.8.W spectra 20us FSR attachment 30 - aida05 1*H spectra - aida05 asic#1 is producing HEC data attachment 31 - aida05 also producing disc data attachments 32 & 33 merger and tape server OK - 14MB/s to disk - no data to MBS currently? 18.36 Disconnect ribbon cabling from adaptor PCB - continue to observe HEC events from aida05 asic#1 Disconnect test inputs from adaptor PCB - continue to observe HEC events from aida05 asic#1 Conclude aida05 asic#1 has probably failed in operation and should be replaced. Other FEE64s are currently in CRYRING hall and measurement is in progress - ML says we should be able to access Monday.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown