AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun May 8 15:10:45 2022
Author
*
:
Subject
*
:
DSSSD bias and FEE64 power OFF during Ge install Photographs of AIDA (triple) + DEGAS setup as of Sunday pm. Attachments 1-4 side/front/oblique views - note AIDA snout droops and twists Attachments 5 & 6 - position of the AIDA stand vertical adjustment threads (brass) The asymmetry upstream-downstream pre-dates this setup. To lift the end of the snout clear of the of lower DEGAS detectors all 3x 1/4 turns clockwise (viewed from above) were applied to each of the four threads.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20220508_160103.jpg
Original size: 4128x3096
Attachment 2:
20220508_160115.jpg
Original size: 4128x3096
Attachment 3:
20220508_160128.jpg
Original size: 4128x3096
Attachment 4:
20220508_160140.jpg
Original size: 4128x3096
Attachment 5:
20220508_160720.jpg
Original size: 4128x3096
Attachment 6:
20220508_160804.jpg
Original size: 4128x3096
Attachment 7:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown