AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:28:51 2025
Author
*
:
Subject
*
:
> 01:37 Over the past hour the degrader settings have been checked by impinging 209Pb onto the detectors. > That is now complete. > Will find optimum thresholds for n+n side and then leave DAQ running with n+n at optimum and p+n at 0xc > > R16 slow comp 0x19 (250keV) 2 and 4 low deadtime 6 and 8 high deadtime. - attachment1 > Will lower 2 and 4 to 200 and raise 6 and 8 to 300 > > R17 2 good, 4 shakey 6 and 8 poor - attachment 2 > > R18 2 and 4 at 220 and 6 and 7 at 350 > 2 and 8 low deadtime, 4 and 6 could be better. - attachment 3 > > > Will run with p+n at 0xc 2+4 at 0x16 and 6 and 8 at 0x23 > Statistics at this rate - attachment 4 > > > > > 02:18 Statistics - attachment 7 > Temperatures - attachment 6 > Bias & leakage current - attachment 5 > > Clock Status - OK > White Rabbit - OK > The other 3 checks currently aren't working > > > > > 04:11 Statistics - attachment 10 > Temperatures - attachment 9 > Bias & leakage current - attachment 8 > > Clock Status - OK > White Rabbit - OK > > > > > 06:05 Statistics - attachment 13 > Temperatures - attachment 12 > Bias & leakage current - attachment 11 > > Clock Status - OK > White Rabbit - OK
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown