AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 439     Entry time: Fri May 13 04:45:23 2022
Author: ML 
Subject: 2h-Shift Checks 

AIDA is running ok. Note that, in the last hour or so, the rate of implant in DSSD1 is back to higher rate ~10 Hzto 15 Hz as at the beginning of this shift.

Stats seems ok

Temperatures stable

Leakage current: ok

A systwm wide check gives same result as for the fist check on this shift at ~1am

Attachment 1: Stats_Screenshot_from_2022-05-13_05-43-14.png  80 kB  Uploaded Fri May 13 05:45:37 2022  | Hide | Hide all
Stats_Screenshot_from_2022-05-13_05-43-14.png
Attachment 2: Temp_Screenshot_from_2022-05-13_05-42-10.png  113 kB  Uploaded Fri May 13 05:45:53 2022  | Hide | Hide all
Temp_Screenshot_from_2022-05-13_05-42-10.png
Attachment 3: HV_LC_Screenshot_from_2022-05-13_05-41-23.png  40 kB  Uploaded Fri May 13 05:46:09 2022  | Hide | Hide all
HV_LC_Screenshot_from_2022-05-13_05-41-23.png
ELOG V3.1.4-unknown