AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:29:08 2025
Author
*
:
Subject
*
:
> 08:36 DAQ Still running smoothly > Currently on run R1_328 > At current data rates we have just over 4 days of space left on the current disk > Analysis of R1_327 - attachment 1 > > 14.15 all histograms zero'd > baseline system wide checks counters > > DAQ continues file S450/R4_33 > > netint pushenable 6 - was 60 - to investigate FEE64 throughput issues > netint flushenable 60 - not changed > > ASIC settings > slow comparator aida02 aida04 0x16, aida06 aida08 0x23, aida12 0xd, all others 0xc > > BNC PB-5 settings > amplitude 1.000V > attenuation x1 > frequency 2Hz > tau_d 1ms (tail pulse) > + polarity > > Attachments 2 & 3 - ucesb > Pb beam intensity c. 4e+8/spill - lower than expected 1e+9/spill . Low implant rates (~Hz/spill) are expected for setting. > > Attachment 4 & 5 - grafana DSSSD bias, leakage current & temp - OK > > Attachments 6-8 - NewMerger stats blocks 0, 1, & 6 > > Attachment 9 - NewMerger link stats > > Attachments 10-11 - TapeServer/NewMerger > > Attachment 12 - iptraf aida-gsi network interfaces > > Attachments 13-14 - per FEE64 1.8.L spectra > pulser peak width aida01 123 ch FWHM, aida04 430 ch FWHM > > Attachments 15-18 - per FEE64 rates and stat spectra > > Attachments 19-22 - system wide checks > aida09 clock status 6, WR decoder status errors > > Attachments 23-26 - adc, pause, resume correlation sclaer data item stats > > Attachment 27 - FEE64 temps OK > > Attachment 28 - DSSSSD bias and leakage currents OK > > 14.30 check ASIC load > > 14.47 attachment 29 - analysis S450/R4_38 > > 15.11 Attachments 30-35 - data push, flush stats for all FEE64s and aida01 (low ADC data item rate) and aida06 (high ADC data item rate)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown