AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:41:55 2025
Author
*
:
Subject
*
:
16:00 Took over remotely from OH, TD who remain in GSI Stats OK - attach 1 Stats & Leakage OK - attach 2 Temps OK Grafana OK - attach 3 System-wide checks: aida09 fails clock (1), aida02 06 09 10 13 fail ADC calibration, all pass WR 17:29 All good, but no beam. 17:30 Beam is back 17:58 No beam again 18:10 Beam is back. Stats OK. Ucesb OK - attach 4 Stats & Leakage currents ok - attach 5 Temps OK - attach 6 Grafana OK - attach 7 System-wide checks as before. 19:36 No beam again. 20:37 Beam is back Stats OK - attach 8 Leakage OK Temps OK Grafana OK - attach 9 Ucesb OK - attach 10 System-wide checks as before 21:10 Lost anydesk connection to DAQ. Local shifters report AIDA still transferring data. 21:15 Local shifters report anydesk connection window still open. Unclear why DAQ reported offline in anydesk. 21:20 Connection restored itself. Hopefully it was a one-off. 22:51 Stats & Leakage current OK - attach 11 Temps OK Grafana OK - attach 12 Ucesb OK - attach 13 System-wide checks as before
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown