AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:30:09 2025
Author
*
:
Subject
*
:
> 16:00 Took over remotely from OH, TD who remain in GSI > > Stats OK - attach 1 > Stats & Leakage OK - attach 2 > Temps OK > Grafana OK - attach 3 > > System-wide checks: aida09 fails clock (1), aida02 06 09 10 13 fail ADC calibration, all pass WR > > 17:29 All good, but no beam. > 17:30 Beam is back > > 17:58 No beam again > 18:10 Beam is back. Stats OK. > > Ucesb OK - attach 4 > Stats & Leakage currents ok - attach 5 > Temps OK - attach 6 > Grafana OK - attach 7 > > System-wide checks as before. > > 19:36 No beam again. > 20:37 Beam is back > > Stats OK - attach 8 > Leakage OK > Temps OK > Grafana OK - attach 9 > Ucesb OK - attach 10 > > System-wide checks as before > > 21:10 Lost anydesk connection to DAQ. Local shifters report AIDA still transferring data. > 21:15 Local shifters report anydesk connection window still open. Unclear why DAQ reported offline in anydesk. > 21:20 Connection restored itself. Hopefully it was a one-off. > > 22:51 Stats & Leakage current OK - attach 11 > Temps OK > Grafana OK - attach 12 > Ucesb OK - attach 13 > > System-wide checks as before
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown