AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 444     Entry time: Fri May 13 23:37:59 2022
Author: ML 
Subject: 2h-Shift Checks 
Took over remotely from CB  about an hour ago

At 0h40 (CET):
      Stats still ok - attach 1
      Leakage still OK - Attach 2
      Temps - attach 3
      Grafana OK
      UCESB rates ok - attach 5
      
      System-wide checks: aida09 fails clock (1), aida02 06 09 10 13 fail ADC calibration, all pass WR
Attachment 1: Stats_Screenshot_from_2022-05-14_00-40-56.png  79 kB  Uploaded Sat May 14 00:48:15 2022  | Hide | Hide all
Stats_Screenshot_from_2022-05-14_00-40-56.png
Attachment 2: HV_LC_Screenshot_from_2022-05-14_00-39-51.png  41 kB  Uploaded Sat May 14 00:49:17 2022  | Hide | Hide all
HV_LC_Screenshot_from_2022-05-14_00-39-51.png
Attachment 3: temp_Screenshot_from_2022-05-14_00-41-44.png  115 kB  Uploaded Sat May 14 00:49:30 2022  | Hide | Hide all
temp_Screenshot_from_2022-05-14_00-41-44.png
Attachment 4: UCESB_Screenshot_from_2022-05-14_01-00-00.png  120 kB  Uploaded Sat May 14 01:02:12 2022  | Hide | Hide all
UCESB_Screenshot_from_2022-05-14_01-00-00.png
ELOG V3.1.4-unknown